Vol 15 No 4 (2009)

Published: 2009-12-31

Articles

  • The time‐cost trade‐off analysis in construction project using computer simulation and interactive procedure

  • Multiskilling in construction ‐ a strategy for stable employment

  • The contribution of optimal turbo fan transport aircraft climb schedule to air company economy

  • The analysis of the quality of the results obtained with the methods of multi‐criteria decisions

  • Multi‐attribute analysis for the eco‐energetic assessment of the building life cycle

  • Multicriterial sustainability assessment of residential buildings

  • Service quality gaps and their role in service enterprises development

  • Fuzzy real options valuation for oil investments