Vol 22 No 7 (2016)

Published: 2016-07-12

Articles

  • Maximizing the value of residential projects using fuzzy rule based linear programming

  • Evaluating motivation of construction workers: a comparison of fuzzy rule-based model with the traditional expectancy theory

  • Study on correlation between fire fighting time and fire loss in urban building based on statistical data

  • Linear and nonlinear fractional hereditary constitutive laws of asphalt mixtures

  • Establishing engineering S-curves to evaluate supervision engineer allocations for highway construction projects

  • Developing construction defect management system using BIM technology in quality inspection

  • An insulation thickness optimization methodology for school buildings rehabilitation combining artificial neural networks and life cycle cost

  • Fuzzy method for analysing uncertainty in the sustainable design of concrete structures

  • Information platform to improve technological innovation capabilities: role of cloud platform

  • Time reduction effect of the enhanced TACT method for high-rise residential buildings

  • Government motivation-embedded return guarantee for urban infrastructure projects based on real options

  • Proposing a neural network model to predict time and cost claims in construction projects

  • Corrigenda

  • Corrigendum