Vol 23 No 7 (2017)

Published: 2017-07-13

Articles

  • Project delay: key electrical construction factors in Hong Kong

  • Fostering the effective usage of risk management in construction

  • Numerical analysis of glulam beams reinforced with CFRP plates

  • Factors affecting contractor’s bidding success for international infrastructure projects in australia

  • Developing a systematic approach to evaluate and predict building service life

  • Random fields of initial out of straightness leading to column buckling

  • Critical factors of the application of nanotechnology in construction industry by using ANP technique under fuzzy intuitionistic environment

  • An integrated fuzzy MCGDM approach for supplier selection problem

  • Data interoperability assessment though IFC for BIM in structural design – a five-year gap analysis

  • Modelling chloride diffusion in concrete with influence of concrete stress state

  • Suggesting a simple design method for cold recycled asphalt mixes with asphalt emulsion