Share:


Project delay: key electrical construction factors in Hong Kong

    Betty W. Y. Chiu Affiliation
    ; Joseph H. K. Lai Affiliation

Abstract

The price of construction project delays is too substantial to pay. Electrical construction is a critical activity influ­encing project completion, but research on its delay factors was limited. Aimed at contributing knowledge to this niche area, a study was conducted in Hong Kong. 56 delay factors, in 10 groups, were found with electrical construction. Processing the data of a survey on 64 consultants and 68 contractors revealed “insufficient labour”, “late decision making of client” and “insuf­ficient electrical contractor” as the top delay factors. Strong agreements on the importance rankings of the delay factors existed between the consultant and contractor groups, and the principal factor components were “incompetent project team members”, “lack of skillful labour” and “poor on-site planning”. Besides discussing the common problems underlying the delay factors, recommendations were made for avoiding the problems. An understanding of the delay factors would help construction stake­holders in taking proactive measures to prevent project delay. The approach of the study can serve as reference for similar, future research in construction management.

Keyword : building, construction, consultant, contractor, delay, electrical

How to Cite
Chiu, B. W. Y., & Lai, J. H. K. (2017). Project delay: key electrical construction factors in Hong Kong. Journal of Civil Engineering and Management, 23(7), 847-857. https://doi.org/10.3846/13923730.2017.1319410
Published in Issue
Jul 13, 2017
Abstract Views
1230
PDF Downloads
1903
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.