Improvement of criteria significance determination / Kriterijų reikšmingumų nustatymo tobulinimas

Abstract

Having determined the significances of criteria by expert methods, we learn how much one of the criteria is more significant over another one. However, having determined by these methods the significances of technical-economical criteria (TEC) (they can be expressed in monetary or natural form: price and production costs of products, maintenance costs, construction time, labour expenditures, etc.), we do not find out everything we need. For instance, quantitative chracteristics of TEC in this case are not fully evaluated. Therefore a method should be developed enabling realistic and accurate assessment of these quantitative changes. The paper presents the method suggested by the author for significance determination of criteria, taking into account their quantitative and qualitative characteristics.

Article in Lithuanian.

First Published Online: 26 Jul 2012

Keywords:

-

How to Cite

Improvement of criteria significance determination / Kriterijų reikšmingumų nustatymo tobulinimas. (1996). Journal of Civil Engineering and Management, 2(5), 64-70. https://doi.org/10.3846/13921525.1996.10531549

Share

Published in Issue
March 31, 1996
Abstract Views
470

View article in other formats

CrossMark check

CrossMark logo

Published

1996-03-31

Issue

Section

Articles

How to Cite

Improvement of criteria significance determination / Kriterijų reikšmingumų nustatymo tobulinimas. (1996). Journal of Civil Engineering and Management, 2(5), 64-70. https://doi.org/10.3846/13921525.1996.10531549

Share