Share:


Improvement of criteria significance determination / Kriterijų reikšmingumų nustatymo tobulinimas

Abstract

Having determined the significances of criteria by expert methods, we learn how much one of the criteria is more significant over another one. However, having determined by these methods the significances of technical-economical criteria (TEC) (they can be expressed in monetary or natural form: price and production costs of products, maintenance costs, construction time, labour expenditures, etc.), we do not find out everything we need. For instance, quantitative chracteristics of TEC in this case are not fully evaluated. Therefore a method should be developed enabling realistic and accurate assessment of these quantitative changes. The paper presents the method suggested by the author for significance determination of criteria, taking into account their quantitative and qualitative characteristics.


Article in Lithuanian.


First Published Online: 26 Jul 2012

Keyword : -

How to Cite
Kaklauskas, A. (1996). Improvement of criteria significance determination / Kriterijų reikšmingumų nustatymo tobulinimas. Journal of Civil Engineering and Management, 2(5), 64-70. https://doi.org/10.3846/13921525.1996.10531549
Published in Issue
Mar 31, 1996
Abstract Views
385
PDF Downloads
289
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.