Share:


Dynamic reaction forces of an overhead crane on lifting

    Bronislovas Spruogis Affiliation
    ; Arūnas Jakštas Affiliation
    ; Vytautas Turla Affiliation
    ; Igor Iljin Affiliation
    ; Nikolaj Šešok Affiliation

Abstract

In the recent period, girder bridge cranes are replaced with double-beam overhead cranes with a rectangular cross-section of the beams. In addition, new materials are used for producing them thus applying other values of allowable loads and deformations. The paper focuses on two overhead cranes working for JSC Vilniaus kranai (Vilnius Cranes). The presented mathematical model provides an opportunity to assess the structural peculiarities of the above introduced cranes. The calculated results of dynamic loads appearing in the beginning and the end of the lifting process and having an impact on the lifting mechanism and metal structure are provided in the article.


First Published Online: 05 Oct 2011

Keyword : overhead crane, lifting process, dynamic model, stifness of the rope, time diagram

How to Cite
Spruogis, B., Jakštas, A., Turla, V., Iljin, I., & Šešok, N. (2011). Dynamic reaction forces of an overhead crane on lifting. Transport, 26(3), 279-283. https://doi.org/10.3846/16484142.2011.622144
Published in Issue
Sep 30, 2011
Abstract Views
518
PDF Downloads
1653
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.