Dynamic reaction forces of an overhead crane on lifting

    Bronislovas Spruogis Info
    Arūnas Jakštas Info
    Vytautas Turla Info
    Igor Iljin Info
    Nikolaj Šešok Info
DOI: https://doi.org/10.3846/16484142.2011.622144

Abstract

In the recent period, girder bridge cranes are replaced with double-beam overhead cranes with a rectangular cross-section of the beams. In addition, new materials are used for producing them thus applying other values of allowable loads and deformations. The paper focuses on two overhead cranes working for JSC Vilniaus kranai (Vilnius Cranes). The presented mathematical model provides an opportunity to assess the structural peculiarities of the above introduced cranes. The calculated results of dynamic loads appearing in the beginning and the end of the lifting process and having an impact on the lifting mechanism and metal structure are provided in the article.

First Published Online: 05 Oct 2011

Keywords:

overhead crane, lifting process, dynamic model, stifness of the rope, time diagram

How to Cite

Spruogis, B., Jakštas, A., Turla, V., Iljin, I., & Šešok, N. (2011). Dynamic reaction forces of an overhead crane on lifting. Transport, 26(3), 279-283. https://doi.org/10.3846/16484142.2011.622144

Share

Published in Issue
September 30, 2011
Abstract Views
728

View article in other formats

CrossMark check

CrossMark logo

Published

2011-09-30

Issue

Section

Original Article

How to Cite

Spruogis, B., Jakštas, A., Turla, V., Iljin, I., & Šešok, N. (2011). Dynamic reaction forces of an overhead crane on lifting. Transport, 26(3), 279-283. https://doi.org/10.3846/16484142.2011.622144

Share