Exploring the technology-organization-environment configurations to enhance stakeholder collaboration in the off-site construction projects

    Zezhou Wu Info
    Ao Li Info
    Shuhui Zhang Info
    Hao Lang Info
    Qiaohui Chen Info
    Hong Xue Info
DOI: https://doi.org/10.3846/jcem.2026.25986

Abstract

Stakeholder collaboration is critical in empowering off-site construction (OSC) projects to reduce the cost overrun, conflicts and quality problems. Prior studies have explored the factors affecting stakeholder collaboration but focused on the net effects, ignoring their interaction relations. Our study aims to explore the configuration conditions to enhance stakeholder collaboration in OSC projects using fuzzy-set qualitative comparative analysis (fsQCA). 103 valid questionnaires are collected to conduct fsQCA to explore the configurational conditions to achieve the high stakeholder collaboration. The findings reveal that there are no necessary conditions as a bottleneck factor constraining stakeholder collaboration emergence in the OSC projects. Three equivalent configurational conditions are identified to achieve high stakeholder collaboration, referring to environment-driven organizational configuration, technology-organizational configuration, and organizational-driven environment configuration. Our study enriches the literature on the antecedent identification of stakeholder collaboration in the OSC project. It also expands the underlying mechanisms between antecedents and stakeholder collaboration from the configurational perspective. Meanwhile, our study provides practical guidance for policymakers and project managers to make decisions by emphasizing the interaction effects of different project governance mechanisms.

Keywords:

off-site construction, stakeholder collaboration, TOE, configuration condition

How to Cite

Wu, Z., Li, A., Zhang, S., Lang, H., Chen, Q., & Xue, H. (2026). Exploring the technology-organization-environment configurations to enhance stakeholder collaboration in the off-site construction projects. Journal of Civil Engineering and Management, 32(2), 213–230. https://doi.org/10.3846/jcem.2026.25986

Share

Published in Issue
March 23, 2026
Abstract Views
48

References

Abedi, M., Fathi, M. S., Mirasa, A. K., & Rawai, N. M. (2016). Integrated collaborative tools for precast supply chain management. Scientia Iranica, 23(2), 429–448. https://doi.org/10.24200/sci.2016.2129

Adade, D., & de Vries, W. T. (2025). An extended TOE framework for local government technology adoption for citizen participation: Insights for city digital twins for collaborative planning. Transforming Government: People, Process and Policy, 19(1), 53–73. https://doi.org/10.1108/TG-01-2024-0025

Al-Aidrous, A.-h. M. H., Shafiq, N., Rahmawati, Y., Mohammed, B. S., Al-Ashmori, Y. Y., Baarimah, A. O., & Alawag, A. M. (2023). Major blocking factors affecting the application of industrialized building system. Ain Shams Engineering Journal, 14(10), Article 102151. https://doi.org/10.1016/j.asej.2023.102151

Alazzaz, F., & Whyte, A. (2015). Linking employee empowerment with productivity in off-site construction. Engineering, Construction and Architectural Management, 22(1), 21–37. https://doi.org/10.1108/ECAM-09-2013-0083

Basurto, X., & Speer, J. (2012). Structuring the calibration of qualitative data as sets for qualitative comparative analysis (QCA). Field Methods, 24(2), 155–174. https://doi.org/10.1177/1525822X11433998

Cao, X., Li, X., Zhu, Y., & Zhang, Z. (2015). A comparative study of environmental performance between prefabricated and traditional residential buildings in China. Journal of Cleaner Production, 109, 131–143. https://doi.org/10.1016/j.jclepro.2015.04.120

Chen, G., Liu, M., Li, H., Hsiang, S. M., & Jarvamard, A. (2023). Motivating reliable collaboration for modular construction: Shapley value–based smart contract. Journal of Management in Engineering, 39(6), Article 04023042. https://doi.org/10.1061/JMENEA.MEENG-5428

Dou, Y., Xue, X., Zhao, Z., & Luo, X. (2019). Factors influencing China’s off-site construction technology innovation diffusion. Sustainability, 11(7), Article 1849. https://doi.org/10.3390/su11071849

Dul, J. (2016a). Identifying single necessary conditions with NCA and fsQCA. Journal of Business Research, 69(4), 1516–1523. https://doi.org/10.1016/j.jbusres.2015.10.134

Dul, J. (2016b). Necessary condition analysis (NCA): Logic and methodology of “necessary but not sufficient” causality. Organizational Research Methods, 19(1), 10–52. https://doi.org/10.1177/1094428115584005

Dul, J., van der Laan, E., & Kuik, R. (2020). A statistical significance test for necessary condition analysis. Organizational Research Methods, 23(2), 385–395. https://doi.org/10.1177/1094428118795272

Feng, T., Tai, S., Sun, C., & Man, Q. (2017). Study on cooperative mechanism of prefabricated producers based on evolutionary game theory. Mathematical Problems in Engineering, 2017, Article 676045. https://doi.org/10.1155/2017/1676045

Fiss, P. C. (2011). Building better causal theories: A fuzzy set approach to typologies in organization research. Academy of Management Journal, 54(2), 393–420. https://doi.org/10.5465/amj.2011.60263120

Gan, X., Chang, R., & Wen, T. (2018). Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis. Journal of Cleaner Production, 201, 735–747. https://doi.org/10.1016/j.jclepro.2018.07.299

Gao, Y., & Tian, X.-L. (2020). Prefabrication policies and the performance of construction industry in China. Journal of Cleaner Production, 253, Article 120042. https://doi.org/10.1016/j.jclepro.2020.120042

Griffith, D. A., & Myers, M. B. (2005). The performance implications of strategic fit of relational norm governance strategies in global supply chain relationships. Journal of International Business Studies, 36(3), 254–269. https://doi.org/10.1057/palgrave.jibs.8400131

Heravi, G., Kebria, M. F., & Rostami, M. (2021). Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), 174–195. https://doi.org/10.1108/ECAM-03-2019-0133

Hoegl, M., & Weinkauf, K. (2005). Managing task interdependencies in multi-team projects: A longitudinal study. Journal of Management Studies, 42(6), 1287–1308. https://doi.org/10.1111/j.1467-6486.2005.00542.x

Hong, J., Shen, G. Q., Mao, C., Li, Z., & Li, K. (2016). Life-cycle energy analysis of prefabricated building components: An input–output-based hybrid model. Journal of Cleaner Production, 112, 2198–2207. https://doi.org/10.1016/j.jclepro.2015.10.030

Hsu, C. C., Tan, K. C., Zailani, S. H. M., & Jayaraman, V. (2013). Supply chain drivers that foster the development of green initiatives in an emerging economy. International Journal of Operations & Production Management, 33(6), 656–688. https://doi.org/10.1108/IJOPM-10-2011-0401

Hu, X., Chong, H.-Y., Wang, X., & London, K. (2019). Understanding stakeholders in off-site manufacturing: A literature review. Journal of Construction Engineering and Management, 145(8), Article 03119003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001674

Hussein, M., & Zayed, T. (2021). Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis. Journal of Cleaner Production, 284, Article 124716. https://doi.org/10.1016/j.jclepro.2020.124716

Jaillon, L., & Poon, C. S. (2010). Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10), 1025–1042. https://doi.org/10.1080/01446193.2010.498481

Jang, Y., Lee, J.-M., & Son, J. (2022). Development and application of an integrated management system for off-site construction projects. Buildings, 12(7), Article 1063. https://doi.org/10.3390/buildings12071063

Jiang, L., Li, Z., Li, L., & Gao, Y. (2018a). Constraints on the promotion of prefabricated construction in China. Sustainability, 10(7), Article 2516. https://doi.org/10.3390/su10072516

Jiang, R., Mao, C., Hou, L., Wu, C., & Tan, J. (2018b). A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation. Journal of Cleaner Production, 173, 225–234. https://doi.org/10.1016/j.jclepro.2017.06.147

Jiao, L., & Li, X. D. (2018). Application of prefabricated concrete in residential buildings and its safety management. Archives of Civil Engineering, 64(2), 21–35. https://doi.org/10.2478/ace-2018-0014

Jin, X. H., & Ling, F. Y. Y. (2005). Constructing a framework for building relationships and trust in project organizations: Two case studies of building projects in China. Construction Management and Economics, 23(7), 685–696. https://doi.org/10.1080/01446190500127039

Julnes, P. de L., & Holzer, M. (2001). Promoting the utilization of performance measures in public organizations: An empirical study of factors affecting adoption and implementation. Public Administration Review, 61(6), 693–708. https://doi.org/10.1111/0033-3352.00140

Kamali, M., & Hewage, K. (2016). Life cycle performance of modular buildings: A critical review. Renewable and Sustainable Energy Reviews, 62, 1171–1183. https://doi.org/10.1016/j.rser.2016.05.031

Kamali, M., Hewage, K., & Milani, A. S. (2018). Life cycle sustainability performance assessment framework for residential modular buildings: Aggregated sustainability indices. Building and Environment, 138, 21–41. https://doi.org/10.1016/j.buildenv.2018.04.019

Lee, S., Jang, Y., Yi, J.-S., & Son, J. (2023). Identifying critical risk factors and management activities for effective offsite construction projects during construction phase. Journal of Management in Engineering, 39(4), Article 04023018. https://doi.org/10.1061/JMENEA.MEENG-5310

Lei, Z., Tang, W., Duffield, C., Zhang, L., & Hui, F. K. P. (2017). The impact of technical standards on international project performance: Chinese contractors’ experience. International Journal of Project Management, 35(8), 1597–1607. https://doi.org/10.1016/j.ijproman.2017.09.002

Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Luo, L. (2016). SWOT analysis and internet of things-enabled platform for prefabrication housing production in Hong Kong. Habitat International, 57, 74–87. https://doi.org/10.1016/j.habitatint.2016.07.002

Li, C. Z., Wen, S., Yi, W., Wu, H., & Tam, V. W. Y. (2024). Offsite construction supply chain challenges: An integrated overview. Journal of Construction Engineering and Management, 150(7), Article 03124003. https://doi.org/10.1061/JCEMD4.COENG-14444

Li, X., Lu, W., Xue, F., Wu, L., Zhao, R., Lou, J., & Xu, J. (2022a). Blockchain-enabled IoT-BIM platform for supply chain management in modular construction. Journal of Construction Engineering and Management, 148(2), Article 04021195. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002229

Li, Y., Wang, Y., Wang, L., & Xie, J. (2022b). Investigating the effects of stakeholder collaboration strategies on risk prevention performance in a digital innovation ecosystem. Industrial Management & Data Systems, 122(9), 2045–2071. https://doi.org/10.1108/IMDS-12-2021-0805

Liu, G., Li, K., Zhao, D., & Mao, C. (2017). Business model innovation and its drivers in the Chinese construction industry during the shift to modular prefabrication. Journal of Management in Engineering, 33(3), Article 04016051. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000501

Liu, Y., Chang, R.-D., Zuo, J., Xiong, F., & Dong, N. (2022). What leads to the high capital cost of prefabricated construction in China: Perspectives of stakeholders. Engineering, Construction and Architectural Management, 30(2), 805–832. https://doi.org/10.1108/ECAM-06-2021-0538

Lu, P., Guo, S., Qian, L., He, P., & Xu, X. (2015). The effectiveness of contractual and relational governances in construction projects in China. International Journal of Project Management, 33(1), 212–222. https://doi.org/10.1016/j.ijproman.2014.03.004

Luo, L.-Z., Mao, C., Shen, L., & Li, Z. (2015). Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China. Engineering, Construction and Architectural Management, 22(6), 622–643. https://doi.org/10.1108/ECAM-04-2014-0048

Luo, T., Xue, X., Wang, Y., Xue, W., & Tan, Y. (2021). A systematic overview of prefabricated construction policies in China. Journal of Cleaner Production, 280, Article 124371. https://doi.org/10.1016/j.jclepro.2020.124371

Ma, S., Li, Z., Li, L., Yuan, M., & Yin, X. (2023). Exploring the effect of stakeholder relationship quality on technological innovation in off-site construction: The mediating role of the knowledge sharing. Journal of Civil Engineering and Management, 29(1), 77–92. https://doi.org/10.3846/jcem.2022.17870

Malik, S., Chadhar, M., Vatanasakdakul, S., & Chetty, M. (2021). Factors affecting the organizational adoption of blockchain technology: Extending the technology-organization-environment (TOE) framework in the Australian context. Sustainability, 13(16), Article 9404. https://doi.org/10.3390/su13169404

Mao, C., Shen, Q., Pan, W., & Ye, K. (2015). Major barriers to off-site construction: The developer’s perspective in China. Journal of Management in Engineering, 31(3), Article 04014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246

Marks, M. A., Mathieu, J. E., & Zaccaro, S. J. (2001). A temporally based framework and taxonomy of team processes. Academy of Management Review, 26(3), 356–376. https://doi.org/10.5465/amr.2001.4845785

McKnight, B., & Zietsma, C. (2018). Finding the threshold: A configurational approach to optimal distinctiveness. Journal of Business Venturing, 33(4), 493–512. https://doi.org/10.1016/j.jbusvent.2018.03.004

Montoya, M. M., Massey, A. P., & Lockwood, N. S. (2011). 3D collaborative virtual environments: Exploring the link between collaborative behaviors and team performance. Decision Sciences, 42(2), 451–476. https://doi.org/10.1111/j.1540-5915.2011.00318.x

Nasir, M. K., & Hadikusumo, B. H. W. (2019). System dynamics model of contractual relationships between owner and contractor in construction projects. Journal of Management in Engineering, 35(1), Article 04018052. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000666

Nesarnobari, S., Shahzad, W. M., Jelodar, M. B., & Sutrisna, M. (2025). Offsite construction supply chain management: A scientometric analysis and systematic literature review. Architectural Engineering and Design Management, 21(3), 467–490. https://doi.org/10.1080/17452007.2024.2381497

Ning, Y. (2017). Combining formal controls and trust to improve dwelling fit-out project performance: A configurational analysis. International Journal of Project Management, 35(7), 1238–1252. https://doi.org/10.1016/j.ijproman.2017.06.002

Ning, Y. (2018). Impact of quality performance ambiguity on contractor’s opportunistic behaviors in person-to-organization projects: The mediating roles of contract design and application. International Journal of Project Management, 36(4), 640–649. https://doi.org/10.1016/j.ijproman.2018.01.008

O’Connor, J. T., O’Brien, W. J., & Choi, J. O. (2016). Industrial project execution planning: Modularization versus stick-built. Practice Periodical on Structural Design and Construction, 21(1), Article 04015014. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000270

Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2008). Leading UK housebuilders’ utilization of offsite construction methods. Building Research and Information, 36(1), 56–67. https://doi.org/10.1080/09613210701204013

Pan, W., Parker, D., & Pan, M. (2023). Problematic interfaces and prevention strategies in modular construction. Journal of Management in Engineering, 39(2), Article 05023001. https://doi.org/10.1061/JMENEA.MEENG-5083

Pauget, B., & Wald, A. (2013). Relational competence in complex temporary organizations: The case of a French hospital construction project network. International Journal of Project Management, 31(2), 200–211. https://doi.org/10.1016/j.ijproman.2012.07.001

Pinto, J. K., Slevin, D. P., & English, B. (2009). Trust in projects: An empirical assessment of owner/contractor relationships. International Journal of Project Management, 27(6), 638–648. https://doi.org/10.1016/j.ijproman.2008.09.010

Ragin, C. C. (2006). Set relations in social research: Evaluating their consistency and coverage. Political Analysis, 14(3), 291–310. https://doi.org/10.1093/pan/mpj019

Ragin, C. C. (2009). Redesigning social inquiry: Fuzzy sets and beyond. University of Chicago Press. https://doi.org/10.7208/chicago/9780226702797.001.0001

Razkenari, M., Fenner, A., Shojaei, A., Hakim, H., & Kibert, C. (2020). Perceptions of offsite construction in the United States: An investigation of current practices. Journal of Building Engineering, 29, Article 101138. https://doi.org/10.1016/j.jobe.2019.101138

Sarin, S., & Mahajan, V. (2001). The effect of reward structures on the performance of cross-functional product development teams. Journal of Marketing, 65(2), 35–53. https://doi.org/10.1509/jmkg.65.2.35.18252

Shalley, C. E., & Oldham, G. R. (1997). Competition and creative performance: Effects of competitor presence and visibility. Creativity Research Journal, 10(4), 337–345. https://doi.org/10.1207/s15326934crj1004_5

Shazmin, S. A. A., Sipan, I., & Sapri, M. (2016). Property tax assessment incentives for green building: A review. Renewable and Sustainable Energy Reviews, 60, 536–548. https://doi.org/10.1016/j.rser.2016.01.081

Shen, W., Liu, Y., Tang, W., Wang, S., Duffield, C. F., Hui, F. K. P., & Zhang, L. (2024). Configuring success: Unveiling key configurations for enhanced design coordination in hydropower projects. Journal of Construction Engineering and Management, 150(12), Article 04024173. https://doi.org/10.1061/JCEMD4.COENG-14830

Tan, Y., Shen, L., & Langston, C. (2012). Competition environment, strategy, and performance in the Hong Kong construction industry. Journal of Construction Engineering and Management, 138(3), 352–360. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000407

Tang, X., Chong, H.-Y., & Zhang, W. (2019). Relationship between BIM implementation and performance of OSM projects. Journal of Management in Engineering, 35(5), Article 04019019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000704

Teng, Y., Mao, C., Liu, G., & Wang, X. (2017). Analysis of stakeholder relationships in the industry chain of industrialized building in China. Journal of Cleaner Production, 152, 387–398. https://doi.org/10.1016/j.jclepro.2017.03.094

Tornatzky, L. G., & Fleischer, M. (1990). The processes of technological innovation. Lexington Books.

Vis, B., & Dul, J. (2018). Analyzing relationships of necessity not just in kind but also in degree: Complementing fsQCA with NCA. Sociological Methods & Research, 47(4), 872–899. https://doi.org/10.1177/0049124115626179

Wagemann, C., Buche, J., & Siewert, M. B. (2016). QCA and business research: Work in progress or a consolidated agenda? Journal of Business Research, 69(7), 2531–2540. https://doi.org/10.1016/j.jbusres.2015.10.010

Wang, T., Tang, W., Du, L., Duffield, C. F., & Wei, Y. (2016). Relationships among risk management, partnering, and contractor capability in international EPC project delivery. Journal of Management in Engineering, 32(6), Article 04016017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000459

Wang, Y., Li, H., & Wu, Z. (2019a). Attitude of the Chinese public toward off-site construction: A text mining study. Journal of Cleaner Production, 238, Article 117926. https://doi.org/10.1016/j.jclepro.2019.117926

Wang, Z., Shen, H., & Zuo, J. (2019b). Risks in prefabricated buildings in China: Importance-performance analysis approach. Sustainability, 11(12), Article 3450. https://doi.org/10.3390/su11123450

Wang, Y., Xue, X., Yu, T., & Wang, Y. (2021). Mapping the dynamics of China’s prefabricated building policies from 1956 to 2019: A bibliometric analysis. Building Research & Information, 49(2), 216–233. https://doi.org/10.1080/09613218.2020.1789444

Wang, B., Geng, L., Dang, P., & Zhang, L. (2022). Developing a framework for dynamic organizational resilience analysis in prefabricated construction projects: A project life cycle perspective. Journal of Construction Engineering and Management, 148(10), Article 04022110. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002381

Wong, P. S.-P., & Cheung, S.-O. (2004). Trust in construction partnering: Views from parties of the partnering dance. International Journal of Project Management, 22(6), 437–446. https://doi.org/10.1016/j.ijproman.2004.01.001

Wong, W. K., Cheung, S. O., Yiu, T. W., & Pang, H. Y. (2008). A framework for trust in construction contracting. International Journal of Project Management, 26(8), 821–829. https://doi.org/10.1016/j.ijproman.2007.11.004

Wong, P. S. P., Zwar, C., & Gharaie, E. (2017). Examining the drivers and states of organizational change for greater use of prefabrication in construction projects. Journal of Construction Engineering and Management, 143(7), Article 04017020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001309

Wu, G.-C., Ding, J.-H., & Chen, P.-S. (2012). The effects of GSCM drivers and institutional pressures on GSCM practices in Taiwan’s textile and apparel industry. International Journal of Production Economics, 135(2), 618–636. https://doi.org/10.1016/j.ijpe.2011.05.023

Wu, G., Zhao, X., Zuo, J., & Zillante, G. (2018). Effects of contractual flexibility on conflict and project success in megaprojects. International Journal of Conflict Management, 29(2), 253–278. https://doi.org/10.1108/IJCMA-06-2017-0051

Wuni, I. Y., & Shen, G. Q. (2020). Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies. Journal of Cleaner Production, 249, Article 119347. https://doi.org/10.1016/j.jclepro.2019.119347

Xia, M., Zhao, L., & Zhao, L. (2022). A comprehensive risk-assessment method for prefabricated buildings using EPC: A case study from China. Sustainability, 14(3), Article 1910. https://doi.org/10.3390/su14031910

Xue, H., Zhang, S., Su, Y., Wu, Z., & Yang, R. J. (2018). Effect of stakeholder collaborative management on off-site construction cost performance. Journal of Cleaner Production, 184, 490–502. https://doi.org/10.1016/j.jclepro.2018.02.258

Xue, H., Wu, Z., Sun, Z., & Jiao, S. (2021). Effects of policy on developer’s implementation of off-site construction: The mediating role of the market environment. Energy Policy, 155, Article 112342. https://doi.org/10.1016/j.enpol.2021.112342

Xue, H., Sun, T., & Zheng, J. (2022). Organizational elements and collaborative organizational citizenship behavior in off-site construction projects: Configurational approach. Journal of Construction Engineering and Management, 148(10), Article 04022108. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002379

Yan, L., & Zhang, L. (2020). Interplay of contractual governance and trust in improving construction project performance: Dynamic perspective. Journal of Management in Engineering, 36(4), Article 04020029. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000791

Yang, D., He, Q., Cui, Q., & Hsu, S.-C. (2018). Organizational citizenship behavior in construction megaprojects. Journal of Management in Engineering, 34(4), Article 04018017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000614

Yang, Y., Pan, M., Pan, W., & Zhang, Z. (2021). Sources of uncertainties in offsite logistics of modular construction for high-rise building projects. Journal of Management in Engineering, 37(3), Article 04021011. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000905

Zhai, X., Reed, R., & Mills, A. (2014). Factors impeding the offsite production of housing construction in China: An investigation of current practice. Construction Management and Economics, 32(1–2), 40–52. https://doi.org/10.1080/01446193.2013.787491

Zhai, Y., Zhong, R. Y., Li, Z., & Huang, G. (2017). Production lead-time hedging and coordination in prefabricated construction supply chain management. International Journal of Production Research, 55(14), 3984–4002. https://doi.org/10.1080/00207543.2016.1231432

Zhang, S. B., Fu, Y. F., Gao, Y., & Zheng, X. D. (2016). Influence of trust and contract on dispute negotiation behavioral strategy in construction subcontracting. Journal of Management in Engineering, 32(4), Article 04016001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000427

Zhang, Y., Lei, Z., Han, S., Bouferguene, A., & Al-Hussein, M. (2020). Process-oriented framework to improve modular and offsite construction manufacturing performance. Journal of Construction Engineering and Management, 146(9), Article 04020116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001909

Zhang, S., Li, Z., Ma, S., Li, L., & Yuan, M. (2022). Critical factors influencing interface management of prefabricated building projects: Evidence from China. Sustainability, 14(9), Article 5418. https://doi.org/10.3390/su14095418

Zhang, X., Shen, W., Tang, W., Duffield, C. F., Hui, F. K. P., Zhang, L., & Lou, C. (2024). How to improve the effects of knowledge governance on individual learning across projects: From the perspective of relational capital. International Journal of Project Management, 42(1), Article 102562. https://doi.org/10.1016/j.ijproman.2024.102562

Zhao, D., Duva, M., Mollaoglu, S., Frank, K., Garcia, A., & Tait, J. (2021). Integrative collaboration in fragmented project organizations: Network perspective. Journal of Construction Engineering and Management, 147(10), Article 04021115. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002149

Zhou, J., Tam, V. W. Y., Qin, Y., & Illankoon, C. (2024). A critical review and comparative analysis of cost management on prefabricated construction research (2000–2022). International Journal of Construction Management, 24(9), 997–1006. https://doi.org/10.1080/15623599.2023.2193920

View article in other formats

CrossMark check

CrossMark logo

Published

2026-03-23

Issue

Section

Articles

How to Cite

Wu, Z., Li, A., Zhang, S., Lang, H., Chen, Q., & Xue, H. (2026). Exploring the technology-organization-environment configurations to enhance stakeholder collaboration in the off-site construction projects. Journal of Civil Engineering and Management, 32(2), 213–230. https://doi.org/10.3846/jcem.2026.25986