Share:


A real option approach to determine optimal intervention windows for multi-national rail corridors

    Nam Lethanh Affiliation
    ; Bryan T. Adey Affiliation

Abstract

In this paper, a real option approach to determine the optimal time to execute interventions on rail infrastructure, when it is not known for certain which intervention is to be executed, is presented (i.e. the optimal intervention window). Such an approach is useful in the management of rail infrastructure that belongs to a multi-national rail corridor where multiple railway organizations, ideally, should coordinate their maintenance interventions, years in advance, to minimize service disruptions. The approach is based on an adaptation of the Black and Scholes differential equation model used to value European call options in financial engineering. It is demonstrated by determining the optimal intervention window for infrastructure in a fictive rail corridor.

Keyword : maintenance, rail infrastructure, real options

How to Cite
Lethanh, N., & T. Adey, B. (2015). A real option approach to determine optimal intervention windows for multi-national rail corridors. Journal of Civil Engineering and Management, 22(1), 38-46. https://doi.org/10.3846/13923730.2014.994030
Published in Issue
Dec 18, 2015
Abstract Views
609
PDF Downloads
397
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.