The optimisation of loading facilities at the terminal

    Danute Bagdoniene Info
    Skirmantas Mazūra Info
DOI: https://doi.org/10.3846/16484142.2004.9637983

Abstract

In freight transportation, when a cargo is carried from one terminal to some others (or from several terminals to one area), the delay time of vehicles and loading equipment may be considerable because their operation is not well coordinated. In the presented investigation the appropriate number of transport and loading facilities to ensure their coordinated work at the terminal is determined. The problem of transportation is analysed in the terms of mass service assignment. The problems of stock management and proper choice of transport facilities are defined and analysed taking into account the relationship between the cost of transportation and vehicle capacity and the size of cargo lots. By using mathematical statistical methods, the optimal vehicle capacity is determined for a particular lot on the routes taking the cargo out as well as the periodicity of cargo delivery.

First Published Online: 27 Oct 2010

Keywords:

loading equipment, time of vehicle's turnover, organization of freight transportation

How to Cite

Bagdoniene, D., & Mazūra, S. (2004). The optimisation of loading facilities at the terminal. Transport, 19(6), 239-251. https://doi.org/10.3846/16484142.2004.9637983

Share

Published in Issue
December 31, 2004
Abstract Views
460

View article in other formats

CrossMark check

CrossMark logo

Published

2004-12-31

Issue

Section

Original Article

How to Cite

Bagdoniene, D., & Mazūra, S. (2004). The optimisation of loading facilities at the terminal. Transport, 19(6), 239-251. https://doi.org/10.3846/16484142.2004.9637983

Share