Determination of optimal work start time

    Shu-Guang Li Info
DOI: https://doi.org/10.3846/16484142.2007.9638095

Abstract

The question is: whether the system total travel cost and travel time are reduced by adjusting the work start time or not? This paper proposes the two‐level model for answering the question; the upper‐level minimizes the system travel cost and travel time by using the work start time as a decision variable, the lower‐level models the stochastic dynamic simultaneous route/departure time equilibrium problem. Finally, numerical results of a small network are provided to illustrate the behavior of the model.

First Published Online: 27 Oct 2010

Keywords:

optimal work start time, stochastic dynamic simultaneous route/departure time equilibrium

How to Cite

Li, S.-G. (2007). Determination of optimal work start time. Transport, 22(1), 45-49. https://doi.org/10.3846/16484142.2007.9638095

Share

Published in Issue
March 31, 2007
Abstract Views
537

View article in other formats

CrossMark check

CrossMark logo

Published

2007-03-31

Issue

Section

Original Article

How to Cite

Li, S.-G. (2007). Determination of optimal work start time. Transport, 22(1), 45-49. https://doi.org/10.3846/16484142.2007.9638095

Share