An integrated sustainable framework for ecological risk  assessment in mining projects

    Feng Liu Info
    Ahmad Alkhayyat Info
    Abdolreza Yazdani-Chamzini Info
    Jonas Šaparauskas Info
    Zenonas Turskis Info
DOI: https://doi.org/10.3846/jeelm.2026.28925

Abstract

Mining is a dangerous activity associated with adverse environmental, social, and economic effects. The underlying reason for environmental impact assessment is to evaluate and eliminate mining operations’ physical, social, economic, and biological impact on the existing environment. However, different models have been developed to assess the environmental impacts. The Leopold matrix is a systematic approach that helps authorities evaluate mining projects based on environmental impacts. However, the Leopold matrix is criticized for its inability to consider the inherent uncertainty imposed by the problem under consideration. On the other hand, fuzzy logic is a robust mathematical tool for facing such situations. Likewise, Multi-Criteria Decision-Making (MCDM) techniques are among the most appropriate methods for formulating a complex and sophisticated problem. Therefore, the paper proposed a hybrid evaluation model using the COPRAS technique and the Analytical Hierarchy Process (AHP) method under a fuzzy environment where the uncertainties are formulated with linguistic variables. This article proposes to use the Leopold matrix to extract the factors and actions. Then, the fuzzy AHP helped determine the criteria and sub-criteria weights. Finally, fuzzy COPRAS computes the utility degree of options. A case study presents the potential use of the proposed model. The results showed that transportation is located in the first rank with the comparative preference and the utility degree of 0.832 and 100, respectively.

Keywords:

fuzzy AHP, COPRAS, ecological risk assessment, open pit mine
Published in Issue
November 16, 2026
Abstract Views
0

How to Cite

Liu, F., Alkhayyat, A., Yazdani-Chamzini, A., Šaparauskas, J., & Turskis, Z. (2026). An integrated sustainable framework for ecological risk  assessment in mining projects. Journal of Environmental Engineering and Landscape Management, 34(4), 420–435. https://doi.org/10.3846/jeelm.2026.28925

Share

References

Agboola, O., Babatunde, D. E., Fayomi, O. S. I., Sadiku, E. R., Popoola, P., Moropeng, L., Yahaya, A., & Mamudu, O. A. (2020). A review on the impact of mining operation: Monitoring, assessment and management. Results in Engineering, 8, Article 100181. https://doi.org/10.1016/j.rineng.2020.100181

Amiri, S., Azarnivand, H., Ghorbani, M., Jafari, M., Barkhordari, S., & Azadi, H. (2024). Environmental impact assessment of mine utilization using Iranian Leopold Matrix (Study area: Sangan khaf mines). Journal of Range and Watershed Managment, 77(1), 18–32.

Arora, H. D., & Naithani, A. (2023). Some distance measures for triangular fuzzy numbers under technique for order of preference by similari-ty to ideal solution environment. OPSEARCH, 60, 701–719. https://doi.org/10.1007/s12597-023-00627-2

Ataei, M., Tajvidi Asr, E., Khalokakaie, R., Ghanbari, K., & Tavakoli Mohammadi, M. R. (2016). Semi-quantitative environmental impact as-sessment and sustainability level determination of coal mining using a mathematical model. Journal of Mining & Environment, 7(2), 185–193. https://doi.org/10.22044/jme.2016.515

Aung, T. R., Choi, D., & Jung, J. (2024). Adapting an environmental impact assessment method for open pit mines in Myanmar: A modified semi-mathematical Folchi approach. Environmental Impact Assessment Review, 108, Article 107599. https://doi.org/10.1016/j.eiar.2024.107599

Ayiwouo, M. N., Sriram, S., Ngounouno, F. Y., Rajagopal, K., & Ngounouno, I. (2023). Assessment of the environmental impacts of gold mining activities at Gankombol (Adamawa-Cameroon) using Leopold matrix, Fecteau grid and remote sensing approach. Journal of African Earth Sciences, 207, Article 105050. https://doi.org/10.1016/j.jafrearsci.2023.105050

Badakhshan, N., Shahriar, K., Afraei, S., & Bakhtavar, E. (2023). Determining the environmental costs of mining projects: A comprehensive quantitative assessment. Resources Policy, 82, Article 103561.

https://doi.org/10.1016/j.resourpol.2023.103561

Badri, A., Nadeau, S., & Gbodossou, A. (2011). Integration of OHS into risk management in an open-pit mining project in Quebec (Canada). Minerals, 1(1), 3–29. https://doi.org/10.3390/min1010003

Berg, A. V. D. (2017). Environmental impact assessment report and environmental management programme. REC Services PTY LTD.

Borujeni, M. P., & Gitinavard, H. (2017). Evaluating the sustainable mining contractor selection problems: An imprecise last aggregation preference selection index method. Journal of Sustainable Mining, 16(4), 207–218. https://doi.org/10.1016/j.jsm.2017.12.006

Cai, Z., Lei, S., Zhao, Y., Gong, C., Wang, W., & Du, C. (2022). Spatial distribution and migration characteristics of heavy metals in Grassland Open-Pit Coal Mine Dump Soil Interface. International Journal of Environmental Research and Public Health, 19(8), Article 4441. https://doi.org/10.3390/ijerph19084441

Chang, D.-Y. (1996). Applications of the extent analysis method on fuzzy AHP. European Journal of Operational Research, 95(3), 649–655. https://doi.org/10.1016/0377-2217(95)00300-2

Chen, Z., Zhao, Y., Chen, D., Huang, H., Zhao, Y., & Wu, Y. (2023). Ecological risk assessment and early warning of heavy metal cumulation in the soils near the Luanchuan molybdenum polymetallic mine concentration area, Henan Province, central China. China Geology, 6(1), 15–26. https://doi.org/10.31035/cg2023003

Cleary, D., & Thornton, I. (1994). The environmental impact of gold mining in the Brazilian Amazon. In R. E. Hester & R. M. Harrison (Eds.), Mining and its environmental impact (Vol. 1, pp. 17–29). Royal Society of Chemistry. https://doi.org/10.1039/9781847551467-00017

Collins, P. C., Croot, P., Carlsson, J., Colaço, A., Grehan, A., Hyeong, K., Kennedy, R., Mohn, Ch., Smith, S., Yamamoto, H., & Rowden, A. (2013). A primer for the Environmental Impact Assessment of mining at seafloor massive sulfide deposits. Marine Policy, 42, 198–209. https://doi.org/10.1016/j.marpol.2013.01.020

Dahlmanns, A., Kostecka, A., Rerak, N., Sobczyk, W., Vundać, N., & Zakova, L. (2024). The impact of the mining facility on the environment on the example of the Křoví Quarry (Czech Republic) [Preprint]. https://doi.org/10.20944/preprints202407.1222.v1

Demková, L., Árvay, J., Bobuľská, L., Hauptvogl, M., & Hrstková, M. (2019). Open mining pits and heaps of waste material as the source of undesirable substances: Biomonitoring of air and soil pollution in former mining area (Dubnik, Slovakia). Environmental Science and Pollu-tion Research, 26, 35227–35239. https://doi.org/10.1007/s11356-019-06582-0

Deng, H. (1999). Multi-criteria analysis with fuzzy pairwise comparisons. International Journal of Approximate Reasoning, 21(3), 215–231. https://doi.org/10.1016/S0888-613X(99)00025-0

Deveci, M., Varouchakis, E. A., Brito-Parada, P. R., Mishra, A. R., Rani, P., Bolgkoranou, M., & Galetakis, M. (2023). Evaluation of risks impeding sustainable mining using Fermatean fuzzy score function based SWARA method. Applied Soft Computing, 139, Article 110220. https://doi.org/10.1016/j.asoc.2023.110220

Ellis, D., & Connolly, J. (1996). Environmental Impact Assessment (EIA) Guidelines for Mine Development and Tailings Disposal at Tropical Coastal Mines (Technical Report No. SRS 95). South Pacific Regional Environment Programme.

Environmental Law Alliance Worldwide. (2010). Guidebook for evaluating mining project EIAs (1st ed.). https://elaw.org/wp-content/uploads/archive/attachments/publicresource/guidebook_for_evaluating_mining_project_eias_english.pdf

Erdem, M., Özdemir, A., Kosunalp, S., & Iliev, T. (2025). Assessment of sustainability and risk indicators in an urban logistics network analysis considering a business continuity plan. Applied Sciences, 15(9), Article 5145. https://doi.org/10.3390/app15095145

Fan, T., Pan, J., Wang, X., Wang, S., & Lu, A. (2022). Ecological risk assessment and source apportionment of heavy metals in the soil of an opencast mine in Xinjiang. International Journal of Environmental Research and Public Health, 19(23), Article 15522. https://doi.org/10.3390/ijerph192315522

Feng, L., Ma, J., Wang, Y., & Yang, J. (2017). Supply chain downstream strategic cost evaluation using L-COPRAS method in cross-border E-commerce. International Journal of Computational Intelligence Systems, 10, 815–823. https://doi.org/10.2991/ijcis.2017.10.1.54

Florkowska, L., Bryt-Nitarska, I., & Kruczkowski, J. (2021). Deformation and damage to buildings caused by ground movements in mining areas (case study). Inżynieria Bezpieczeństwa Obiektów Antropogenicznych, (4). https://doi.org/10.37105/iboa.125

Folchi, R. (2003, February 2–5). Environmental impact statement for mining with explosives: A quantitative method. In Proceedings of the 29th Annual Conference on Explosives and Blasting Technique. Northville, Tennessee, USA. I.S.E.E.

Fouladgar, M. M., Yazdani-Chamzini, A., Lashgari, A., Zavadskas, E. K., & Turskis, Z. (2012a). Maintenance strategy selection using AHP and COPRAS under fuzzy environment. International Journal of Strategic Property Management, 16(1), 85–104. https://doi.org/10.3846/1648715X.2012.666657

Fouladgar, M. M., Yazdani-Chamzini, A., Zavadskas, E. K., & Moini, S. H. H. (2012b). A new hybrid model for evaluating the working strategies: Case study of construction company. Technological and Economic Development of Economy, 18(1), 164–188. https://doi.org/10.3846/20294913.2012.667270

Ghosh, S., Banerjee, S., Prajapati, J., Mandal, J., Mukherjee, A., & Bhattacharyya, P. (2023). Pollution and health risk assessment of mine tailings contaminated soils in India from toxic elements with statistical approaches. Chemosphere, 324, Article 138267. https://doi.org/10.1016/j.chemosphere.2023.138267

Gitinavard, H. (2019). Strategic evaluation of sustainable projects based on hybrid group decision analysis with incomplete information. Journal of Quality Engineering and Production Optimization, 4(2), 17–30.

Gitinavard, H., Shirazi, M. A., & Zarandi, M. H. F. (2020). Sustainable feedstocks selection and renewable products allocation: A new hybrid adaptive utility-based consensus model. Journal of Environmental Management, 264, Article 110428. https://doi.org/10.1016/j.jenvman.2020.110428

Heydari, M., & Osanloo, M. (2025). A spatiotemporal environmental sustainability assessment model for deep and large-scale open-pit copper mines. International Journal of Engineering, 38(4), 830–847. https://doi.org/10.5829/ije.2025.38.04a.14

Hosseini, M. P., & Norouzi, K. (2023). Feasibility of establishing municipal waste processing and recycling facilities (Case study: Western cities of Kermanshah province). Journal of Environmental Science Studies, 8(3), 7093–7101.

International Atomic Energy Agency. (2005). Guidebook on environmental impact assessment for in situ leach mining projects (IAEA-TECDOC-1428). https://www-pub.iaea.org/MTCD/Publications/PDF/TE_1428_web.pdf

Iphar, M., & Cukurluoz, A. K. (2018). Fuzzy risk assessment for mechanized underground coal mines in Turkey. International Journal of Occupa-tional Safety and Ergonomics, 26(2), 256–271. https://doi.org/10.1080/10803548.2018.1426804

Jahanishakib, F., & Salary, M. (2023). Roads impact assessment on wildlife habitats using Leopold Matrix for mitigations: A case study in Darmian protected area. Sustainable Earth Trends, 3(1), 44–53.

Jantunen, J., Kauppila, T., Räisänen, M. L., Komulainen, H., Kauppila, P., Kau­p­pi­nen, T., Törmä, H., Leppänen, M., Tornivaara, A., Pasanen, A., Kemppai­nen, E., Raunio, A., Marttunen, M., Mustajoki, J., Kauppi, S., Ekholm, P., Hut­tula, T., Makkonen, H., & Loukola-Ruskeeniemi, K. (2015). Environmental impact assessment procedure for mining projects in Finland. Ministry of Employment and the Economy. https://julkaisut.valtioneuvosto.fi/server/api/core/bitstreams/f8afc1d7-2539-45e9-b469-8d0843365b37/content

Johansen, P., & Asmund, G. (1999). Pollution from mining in Greenland: Monitoring and mitigation of environmental impacts. In J. M. Azeue (Ed.), Environmental impacts of mining activities: Emphasis on mitigation and remedial measures (245–262). Springer. https://doi.org/10.1007/978-3-642-59891-3_15

Kasap, Y., & Subaşı, E. (2017). Risk assessment of occupational groups working in open pit mining: Analytic hierarchy process. Journal of Sustainable Mining, 16(2), 38–46. https://doi.org/10.1016/j.jsm.2017.07.001

Koščová, M., Hellmer, M., Anyona, S., Gvozdkova, T. (2018). Geo-environmental problems of open pit mining: Classification and solutions. E3S Web of Conferences, 41, Article 01034. EDP Sciences. https://doi.org/10.1051/e3sconf/20184101034

Leite, M. D. S., Ribeiro, G. D. N., Nogueira, V. D. F. B., Pedroza, A. P., Santos, C. I., Silva Filho, V. G., Paz, M. A. D. F., Lima, D. C., Gomes, K. D. N., Santos, K. L. D. A., Marques, A. T., Gomes, A. B., Costa, K. L. P. (2024). Environmental impact assessment of a sanitary landfill in a municipality of the brazilian semiarid region using The Leopold Interaction Matrix. IOSR Journal of Business and Management, 26, 19–28.

Leopold, L. B., Clarke, F. E., Hanshaw, B. B., & Balsley, J. E. (1971). A procedure for evaluating environmental impact (U.S. Geological Survey Circu-lar Report No. 645). U.S. Geological Survey. https://doi.org/10.3133/cir645

Li, H., Guo, Z., Hua, X., Dai, B., Zeng, X., & Zhao, Y. (2023). Research on the influence of backfilling mining in an iron mine with complex mining conditions on the stability of surface buildings. Sustainability, 15(20), Article 14733. https://doi.org/10.3390/su152014733

Li, M., Wang, H., Wang, D., Shao, Z., & He, S. (2020). Risk assessment of gas explosion in coal mines based on fuzzy AHP and bayesian net-work. Process Safety and Environmental Protection, 135, 207–218. https://doi.org/10.1016/j.psep.2020.01.003

Macklin, M. G., Thomas, C. J., Mudbhatkal, A., Brewer, P. A., Hudson-Edwards, K. A., Lewin, J., Scussolini, P., Eilander, D., Lechner, A., Owen, J., Bird, G., Kemp, D., & Mangalaa, K. R. (2023). Impacts of metal mining on river systems: A global assessment. Science, 381(6664), 1345–1350. https://doi.org/10.1126/science.adg6704

Mohsin, M., Zhu, Q., Naseem, S., Sarfraz, M., & Ivascu, L. (2021). Mining industry impact on environmental sustainability, economic growth, social interaction, and public health: An application of semi-quantitative mathematical approach. Processes, 9(6), Article 972. https://doi.org/10.3390/pr9060972

Monjezi, M., Shahriar, K., Dehghani, H., & Samimi Namin, F. (2009). Environmental impact assessment of open pit mining in Iran. Environmen-tal Geology, 58, 205–216. https://doi.org/10.1007/s00254-008-1509-4

Mulliner, E., Malys, N., & Maliene, V. (2016). Comparative analysis of MCDM methods for the assessment of sustainable housing affordability. Omega, 59, 146–156. https://doi.org/10.1016/j.omega.2015.05.013

Namin, F. S., Shahriar, K., & Bascetin, A. (2011). Environmental impact assessment of mining activities: A new approach for mining methods selection. Gospodarka Surowcami Mineralnymi, 27(2), 113–143.

Özdemir, A., Erdem, M., Kosunalp, S., & Iliev, T. (2025). Evaluation of sustainable and intelligent transportation processes considering envi-ronmental, social, and risk assessment pillars employing an integrated intuitionistic fuzzy-embedded decision-making methodology. Sustainability, 17(7), Article 2945. https://doi.org/10.3390/su17072945

Pancholi, N., & Bhatt, M. (2018). FMECA-based maintenance planning through COPRAS-G and PSI. Journal of Quality in Maintenance Engineer-ing, 24(2), 224–243. https://doi.org/10.1108/JQME-03-2017-0015

Paustenbach, D. J., Langenbach, B. T., & Wenning, R. J. (2024). Primer on human and environmental risk assessment. In D. J. Paustenbach & K. Feinberg (Eds.), Human and ecological risk assessment: Theory and practice (3rd ed.). Wiley. https://doi.org/10.1002/9781119742975.ch1

Pedrycz, W. (1994). Why triangular membership functions?. Fuzzy Sets and Systems, 64(1), 21–30. https://doi.org/10.1016/0165-0114(94)90003-5

Phillips, J. (2012a). The level and nature of sustainability for clusters of abandoned limestone quarries in the southern Palestinian West Bank. Applied Geography, 32(2), 376–392. https://doi.org/10.1016/j.apgeog.2011.06.009

Phillips, J. (2012b). Using a mathematical model to assess the sustainability of proposed bauxite mining in Andhra Pradesh, India from a quantitative-based environmental impact assessment. Environmental Earth Sciences, 67, 1587–1603. https://doi.org/10.1007/s12665-012-1601-7

Pouresmaieli, M., Ataei, M., & Qarahasanlou, A. N. (2023). A scientometrics view on sustainable development in surface mining: Everything from the beginning. Resources Policy, 82, Article 103410. https://doi.org/10.1016/j.resourpol.2023.103410

Rabbani, A., Zamani, M., Yazdani-Chamzini, A., & Zavadskas, E. K. (2014). Proposing a new integrated model based on sustainability balanced scorecard (SBSC) and MCDM approaches by using linguistic variables for the performance evaluation of oil producing companies. Expert Systems with Applications, 41, 7316–7327. https://doi.org/10.1016/j.eswa.2014.05.023

Rahimi, N., & Khoshfetrat, A. (2024). Modified VIKOR-GP approach by considering the Leopold Matrix for optimal water reuse allocation. Urban Water Journal, 21(6), 757–773. https://doi.org/10.1080/1573062X.2024.2352799

Rees, W. G., & Rigina, O. (2003). Methodologies for remote sensing of the environmental impacts of industrial activity in the arctic and sub-arctic. In R. O. Rasmussen & N. E. Koroleva (Eds.), Social and environmental impacts in the North: Methods in evaluation of so-cio-economic and environmental consequences of mining and energy production in the Arctic and Sub-Arctic (Vol. 31., pp. 67–88). Spring-er. https://doi.org/10.1007/978-94-007-1054-2_6

Rigina, O. (2002). Environmental impact assessment of the mining and concentration activities in the Kola Peninsula, Russia by multidate remote sensing. Environmental Monitoring and Assessment, 75, 13–33. https://doi.org/10.1023/A:1014248522919

Rikhtegar, N., Mansouri, N., Oroumieh, A. A., Yazdani-Chamzini, A., Zavadskas, E. K., & Kildienė, S. (2014). Environmental impact assessment based on group decision-making methods in mining projects. Economic Research, 27(1), 378–392. https://doi.org/10.1080/1331677X.2014.966971

Rufuss, D. D. W., Kumar, V. R., Suganthi, L., Iniyan, S., & Davies, P. A. (2018). Techno-economic analysis of solar stills using integrated fuzzy analytical hierarchy process and data envelopment analysis. Solar Energy, 159, 820–833. https://doi.org/10.1016/j.solener.2017.11.050

Saaty, T. L. (1980). The analytic hierarchy process. McGraw-Hill.

Salehi, S., Gholamreza Fahimi, F., Kiadaliri, M., Tavana, A., & Saeb, K. (2023). Evaluating environmental effects in construction and demolition waste recycling plant with the Iranian Leopold Matrix method. International Journal of Human Capital in Urban Management, 8(2), 245–260. https://doi.org/10.22034/IJHCUM.2023.02.07

Solgi, E., Gitinavard, H., & Tavakkoli-Moghaddam, R. (2021). Sustainable high-tech brick production with energy-oriented consumption: An integrated possibilistic approach based on criteria interdependencies. Sustainability, 14(1), Article 202. https://doi.org/10.3390/su14010202

Standards Australia, & Standards New Zealand. (2004). Risk Management (AS/NZS 4360:2004) and Risk Management Guidelines (HB 436). https://www.standards.org.au/standards-catalogue/standard-details?designation=as-nzs-4360-2004

Tianliang, W., Aghalari, Z., Mubanga, R., Sosa-Hernandez, J. E., Martínez-Ruiz, M., & Parra-Saldívar, R. (2023). Assessing environmental health impacts of coal mining exploitation in Iran: A Rapid Impact Assessment Matrix (RIAM) approach for environmental protection. PLoS ONE, 18(12), Article e0293973. https://doi.org/10.1371/journal.pone.0293973

Timofeeva, S. S., Drozdova, I. V., & Boboev, A. A. (2020). Assessment of occupational risks of employees engaged in open-pit mining. In E3S Web of Conferences, 177, Article 06006. EDP Sciences. https://doi.org/10.1051/e3sconf/202017706006

Valipour, A., Yahaya, N., Md Noor, N., Antuchevičienė, J., & Tamošaitienė, J. (2017). Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: An Iranian case study. Journal of Civil Engineering and Management, 23(4), 524–532. https://doi.org/10.3846/13923730.2017.1281842

Valizadeh, S., & Shekari, Z. (2015). Evaluation of Iranian Leopold Matrix application in the Environmental Impact Assessment (EIA) of solid waste management options in Birjand city. Iranian Journal of Health and Environment, 8(2), 249–262.

Venkataraman, G., Kumar, S. P., Ratha, D. S., Inamdar, A. B., & Nagarajan, R. (1997). Open cast mine monitoring and environmental impact studies through remote sensing – a case study from Goa, India. Geocarto International, 12(2), 39–53. https://doi.org/10.1080/10106049709354584

Woldai, T., & Taranik, J. (2008). Environmental impact assessment of mining related dewatering activities using integrated INSAR, optical remote sensing and pumping data. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XXXVII, 191–197.

Worlanyo, A. S., & Jiangfeng, L. (2021). Evaluating the environmental and economic impact of mining for post-mined land restoration and land-use: A review. Journal of Environmental Management, 279, Article 111623. https://doi.org/10.1016/j.jenvman.2020.111623

Wu, H.-Y., Tzeng, G.-H., & Chen, Y.-H. (2009). A fuzzy MCDM approach for evaluating banking performance based on balanced scorecard. Expert Systems with Applications, 36(6), 10135–10147. https://doi.org/10.1016/j.eswa.2009.01.005

Xu, H., & Cheng, W. (2024). Landscape analysis and ecological risk assessment during 1995–2020 based on land utilization/land coverage (LULC) and random forest: A case study of the Fushun open-pit coal area in Liaoning, China. Sustainability, 16(6), Article 2442. https://doi.org/10.3390/su16062442

Xu, W., Wang, J., Zhang, M., & Li, S. (2021). Construction of landscape ecological network based on landscape ecological risk assessment in a large-scale opencast coal mine area. Journal of Cleaner Production, 286, Article 125523. https://doi.org/10.1016/j.jclepro.2020.125523

Yazdani, M., Alidoosti, A., & Zavadskas, E. K. (2011). Risk analysis of critical infrastructures using fuzzy Copras. Economic Research – Ekonomska Istraživanja, 24(4), 27–40. https://doi.org/10.1080/1331677X.2011.11517478

Yazdani-Chamzini, A., Fouladgar, M. M., Zavadskas, E. K., & Moini, S. H. H. (2013). Selecting the optimal renewable energy using multi criteria decision making. Journal of Business Economics and Management, 14(5), 957–978. https://doi.org/10.3846/16111699.2013.766257

Zadeh, L. A. (1965). Fuzzy sets. Information Control, 8, 338–353. https://doi.org/10.1016/S0019-9958(65)90241-X

Zarbakhshnia, N., Soleimani, H., & Ghaderi, H. (2018). Sustainable third-party reverse logistics provider evaluation and selection using fuzzy SWARA and developed fuzzy COPRAS in the presence of risk criteria. Applied Soft Computing, 65, 307–319. https://doi.org/10.1016/j.asoc.2018.01.023

Zarshenas, Y., & Saeedi, G. (2016). Risk assessment of dilution in open pit mines. Arabian Journal of Geosciences, 9, Article 209. https://doi.org/10.1007/s12517-015-2214-8

Zarubin, M., Statsenko, L., Spiridonov, P., Zarubina, V., Melkoumian, N., & Salykova, O. (2021). A GIS software module for environmental im-pact assessment of the open pit mining projects for small mining operators in Kazakhstan. Sustainability, 13(12), Article 6971. https://doi.org/10.3390/su13126971

Zavadskas, E. K. (1987). Complex estimation and choice of resource saving decisions in construction. Mokslas (in Russian).

Zavadskas, E. K., Kaklauskas, A., & Sarka, V. (1994). The new method of multicriteria complex proportional assessment of projects. Techno-logical and Economic Development of Economy, 1(3), 131–139.

Zhang, H., Zhang, F., Song, J., Tan, M. L., Kung, H.-t., & Johnson, V. C. (2021). Pollutant source, ecological and human health risks assessment of heavy metals in soils from coal mining areas in Xinjiang, China. Environmental Research, 202, Article 111702. https://doi.org/10.1016/j.envres.2021.111702

View article in other formats

CrossMark check

CrossMark logo

Published

2026-11-16

Issue

Section

Articles

How to Cite

Liu, F., Alkhayyat, A., Yazdani-Chamzini, A., Šaparauskas, J., & Turskis, Z. (2026). An integrated sustainable framework for ecological risk  assessment in mining projects. Journal of Environmental Engineering and Landscape Management, 34(4), 420–435. https://doi.org/10.3846/jeelm.2026.28925

Share