Vol 30 No 3 (2024)

Published: 2024-03-08

Articles

  • A review of agent-based modeling in construction management: an analytical framework based on multiple objectives

  • Adaptive LOB scheduling for optimizing resource leveling and consumption

  • MIVES multi-criteria framework to sustainability index of design for manufacture and assembly

  • Analysis of visual impact by new building height through UAVs and photogrammetry

  • Back analysis and stability prediction of surrounding rock during excavation of the Shuangjiangkou underground powerhouse

  • Risk assessment of subway station fire by using a Bayesian network-based scenario evolution model