Vol 27 No 1 (2021)

Published: 2021-01-08

Articles

  • The analysis of barriers to bim implementation for industrialized building construction: a China study

  • Utilization of BIM in the construction of a submarine tunnel: a case study in Xiamen city, China

  • Ontology-based HBIM for historic buildings with traditional woodwork in Taiwan

  • Resilience-cost tradeoff supply chain planning for the prefabricated construction project

  • Sustainability analysis of reused industrial buildings in China: an assessment method

  • Corrigenda

  • Corrigendum: Factors causing rework and their impact on projects’ performance in Egypt