Share:


Eine Analyse von zyklischen Systemen unter Unbestimmtheitsbedingungen

Abstract

This paper presents the problem of balancing specific construction processes with cyclic configuration. The processes of assembly of forming equipment in a monolithic housing building are an example of the consideration. The rules decomposition and synthesis at the production system has been used. Three examples of the loss functions are given. The results of analysis have been compared by means of Laplace's and Wald's criterions.


Article in German.


First Published Online: 26 Jul 2012

Keyword : -

How to Cite
Kapliñski, O. (1995). Eine Analyse von zyklischen Systemen unter Unbestimmtheitsbedingungen. Journal of Civil Engineering and Management, 1(1), 93-101. https://doi.org/10.3846/13921525.1995.10531505
Published in Issue
Mar 31, 1995
Abstract Views
314
PDF Downloads
253
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.