Scheduling model of construction activity with time couplings
Abstract
The algorithm of construction work graphic schedule which takes into account the proper sequencing problem has been presented. The algorithm is described step by step, ie the construction work organisation methods with zero couplings between realisation means. The calculation process of “Limit Possible Minimum” (LPM) taking into account technical and organisation limits is also shown. The second part of the paper includes a practical example which presents the method and the optimisation algorithm for the work organisation method with zero couplings among realisation means.
First Published Online: 26 Jul 2012
Keywords:
scheduling model, construction, couplingsHow to Cite
Share
License
Copyright (c) 2003 The Author(s). Published by Vilnius Gediminas Technical University.
This work is licensed under a Creative Commons Attribution 4.0 International License.
View article in other formats
Published
Issue
Section
Copyright
Copyright (c) 2003 The Author(s). Published by Vilnius Gediminas Technical University.
License
This work is licensed under a Creative Commons Attribution 4.0 International License.