Required additional heating power of building during intermitted heating

    Darius Pupeikis Info
    Arūnas Burlingis Info
    Vytautas Stankevičius Info

Abstract

By introduction of intermittent heating of building we can reduce the thermal energy consumption for heating. But it requires the additional power of heating system. It is determined that the most effective solution for energy savings is to enlarge the heating power approximately by 50% for most of buildings. The simulation has showed that for buildings with a medium thermal inertia (time constant τ = 144 h) the expenses by employing the intermittent heating (reduced temperature period: 12 h on working days and 48 h at weekends), pays back after one year. By designing the heating system we must pay attention to thermal inertia of building. Our research showed that for various thermal inertias of building, the adequate modes of intermittent heating must be chosen.

Published Published Online: 24 Jun 2011

Keywords:

heating system, intermitted heating, building cooling-down, building reheating, outdoor temperature, simulation of intermittent heating, thermal energy consumption, saving of thermal energy

How to Cite

Required additional heating power of building during intermitted heating. (2010). Journal of Civil Engineering and Management, 16(1), 141-148. https://doi.org/10.3846/jcem.2010.13

Share

Published in Issue
March 31, 2010
Abstract Views
671

View article in other formats

CrossMark check

CrossMark logo

Published

2010-03-31

Issue

Section

Articles

How to Cite

Required additional heating power of building during intermitted heating. (2010). Journal of Civil Engineering and Management, 16(1), 141-148. https://doi.org/10.3846/jcem.2010.13

Share