Is contractual flexibility always good for relationship quality among the parties in construction projects?
DOI: https://doi.org/10.3846/jcem.2025.24320Abstract
Contractual flexibility as an effective way to maintain and increase parties’ relationship quality has been widely introduced to contracting in construction projects. However, conflicting evidences exist regarding their effectiveness on relationship quality based on transaction cost theory. Building on two distinct bases for contractual flexibility: content flexibility, rely on flexible content incorporated in initial contract content, versus executing flexibility, rely on parties’ relationship instead of contract contents, this study examines how contractual flexibility effect relationship quality under different transaction attributes (asset specificity, environmental uncertainty, and behavioral uncertainty). Results from a sample of 312 parties reveal that content flexibility and executing flexibility positively influence relationship quality, with executing flexibility having a stronger association than content flexibility. Yet, important conditions exist. The moderating analysis demonstrates that when asset specificity or environmental uncertainty is high, executing flexibility, not content flexibility, matters more to relationship quality. In contrast, when behavioral uncertainty is high, content flexibility, not executing flexibility, matters more to relationship quality. These findings suggest that contractual managers should incorporate executing flexibility into contracts more sufficiently, and the appropriate contractual flexibility should match with transaction attributes.
Keywords:
contractual flexibility, content flexibility, executing flexibility, relationship quality, transaction attributes, asset specificity, environmental uncertainty, behavioral uncertaintyHow to Cite
Share
License
Copyright (c) 2025 The Author(s). Published by Vilnius Gediminas Technical University.
This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Abdi, M., & Aulakh, P. S. (2017). Locus of uncertainty and the relationship between contractual and relational governance in cross-border interfirm relationships. Journal of Management, 43(3), 771–803. https://doi.org/10.1177/0149206314541152
Aiken, L. S., & West, S. G. (1991). Multiple regression: Testing and interpreting interactions. Sage Publications.
Athias, L., & Saussier, S. (2010). Contractual flexibility or rigidity for public private partnerships? Theory and evidence from infrastructure concession contracts. SSRN. https://doi.org/10.2139/ssrn.828944
Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2011). Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, 29(6), 728–739. https://doi.org/10.1016/j.ijproman.2010.07.008
Bstieler, L., & Gross, C. W. (2003). Measuring the effect of environmental uncertainty on process activities, project team characteristics, and new product success. Journal of Business & Industrial Marketing, 18(2), 146–161. https://doi.org/10.1108/08858620310463079
Carson, S. J., Madhok, A., & Wu, T. (2006). Uncertainty, opportunism, and governance: The effects of volatility and ambiguity on formal and relational contracting. Academy of Management Journal, 49(5), 1058–1077. https://doi.org/10.5465/amj.2006.22798187
Chang, C. Y., & Ive, G. (2007). Reversal of bargaining power in construction projects: meaning, existence and implications. Construction Management and Economics, 25(8), 845–855. https://doi.org/10.1080/01446190601164113
Chen, G., Zhang, G., & Xie, Y. M. (2013). Impact of transaction attributes on transaction costs in project alliances: disaggregated analysis. Journal of Management in Engineering, 31(4), Article 04014054. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000259
Chen, Y., Chen, Y., Liu, Z., & Yao, H. (2018). Influence of prior ties on trust in contract enforcement in the construction industry: Moderating role of the shadow of the future. Journal of Management in Engineering, 34(2), Article 04017064. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000584
Cheng, C. Y., Hsieh, C. H., & Yang, Y. S. (2014). Who would engage in unethical behavior? Should organizations bear the responsibility?. Quality and Quantity, 48(4), 2341–2354. https://doi.org/10.1007/s11135-013-9895-4
Cruz, C. O., & Marques, R. C. (2013). Flexible contracts to cope with uncertainty in public-private partnerships. International Journal of Project Management, 31(3), 473–483. https://doi.org/10.1016/j.ijproman.2012.09.006
Davis, K. (2014). Different stakeholder groups and their perceptions of project success. International Journal of Project Management, 32(2), 189–201. https://doi.org/10.1016/j.ijproman.2013.02.006
De Vita, G., Tekaya, A., & Wang, C. L. (2011). The many faces of asset specificity: A critical review of key theoretical perspectives. International Journal of Management Reviews, 13(4), 329–348. https://doi.org/10.1111/j.1468-2370.2010.00294.x
Demirel, H. Ç., Leendertse, W., Volker, L., & Hertogh, M. (2017). Flexibility in PPP contracts-dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), 196–206. https://doi.org/10.1080/01446193.2016.1241414
Ding, Q., & Zhang, L. (2020). Uncertainty and participant’s relationship quality: moderating roles of contractual flexibility. In Construction Research Congress 2020 (pp. 1302–1310). ASCE. https://doi.org/10.1061/9780784482889.139
Domingues, S., Zlatkovic, D., & Roumboutsos, A. (2014). Contractual flexibility in transport infrastructure PPP. In 2014 European Transport Conference. AET.
Dong, F., & Chiara, N. (2010). Improving economic efficiency of public-private partnerships for infrastructure development by contractual flexibility analysis in a highly uncertain context. The Journal of Structured Finance, 16(1), 87–99. https://doi.org/10.3905/jsf.2010.2010.1.002
Etikan, I., Musa, S. A., & Alkassim, R. S. (2016). Comparison of convenience sampling and purposive sampling. American Journal of Theoretical and Applied statistics, 5(1), 1–4. https://doi.org/10.11648/j.ajtas.20160501.11
Fehr, E., Hart, O., & Zehnder, C. (2015). How do informal agreements and revision shape contractual reference points?. Journal of the European Economic Association, 13(1), 1–15. https://doi.org/10.1111/jeea.12098
Feng, Z., Song, J., Yang, X., & Guo, R. (2023). Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts. European Journal of Operational Research, 307(1), 484–496. https://doi.org/10.1016/j.ejor.2022.09.018
Fink, M., & Harms, R. (2012). Contextualizing the relationship between self-commitment and performance: Environmental and behavioural uncertainty in (cross-border) alliances of SMEs. Entrepreneurship and Regional Development, 24(3–4), 161–179. https://doi.org/10.1080/08985626.2012.670911
Fink, L., Wyss, S., & Lichtenstein, Y. (2018). Aligning flexibility with uncertainty in software development arrangements through a contractual typology. Journal of Global Operations and Strategic Sourcing, 11(1), 2–26. https://doi.org/10.1108/JGOSS-11-2016-0033
Fu, Y., Chen, Y., Zhang, S., & Wang, W. (2015). Promoting cooperation in construction projects: An integrated approach of contractual incentive and trust. Construction Management and Economics, 33(8), 653–670. https://doi.org/10.1080/01446193.2015.1087646
Gil, R., & Marion, J. (2013). Self-enforcing agreements and relational contracting: Evidence from California highway procurement. The Journal of Law, Economics, & Organization, 29(2), 239–277. https://doi.org/10.1093/jleo/ewr026
Guo, S., & Wang, J. (2022). Profit distribution in IPD projects based on weight fuzzy cooperative games. Journal of Civil Engineering and Management, 28(1), 68–80. https://doi.org/10.3846/jcem.2021.16156
Hamilton, B. H., & Nickerson, J. A. (2003). Correcting for endogeneity in strategic management research. Strategic Organization, 1(1), 51–78. https://doi.org/10.1177/1476127003001001218
Hart, O., & Moore, J. (2008). Contracts as reference points. The Quarterly Journal of Economics, 123(1), 1–48. https://doi.org/10.1162/qjec.2008.123.1.1
Hazır, Ö., & Ulusoy, G. (2020). A classification and review of approaches and methods for modeling uncertainty in projects. International Journal of Production Economics, 223, Article 107522. https://doi.org/10.1016/j.ijpe.2019.107522
Heeley, M. B., King, D. R., & Covin, J. G. (2006). Effects of firm R&D investment and environment on acquisition likelihood. Journal of Management Studies, 43(7), 1513–1535. https://doi.org/10.1111/j.1467-6486.2006.00636.x
Hoetker, G., & Mellewigt, T. (2009). Choice and performance of governance mechanisms: matching alliance governance to asset type. Strategic Management Journal, 30(10), 1025–1044. https://doi.org/10.1002/smj.775
Hu, Z., Wu, G., Zhao, X., Zuo, J., & Wen, S. (2021). How does the strength of ties influence relationship quality in Chinese megaprojects? The mediating role of contractual flexibility. Baltic Journal of Management, 16(3), 366–385. https://doi.org/10.1108/BJM-09-2020-0347
Hu, Z., Wu, G., Zheng, J., Zhao, X., & Zuo, J. (2023). Unravelling effects of project complexity on project success and project management success: a meta-analytic review. Journal of Civil Engineering and Management, 29(6), 542–560. https://doi.org/10.3846/jcem.2023.19553
Jelodar, M. B., Yiu, T. W., & Wilkinson, S. (2017). Assessing contractual relationship quality: Study of judgment trends among construction industry parties. Journal of Management in Engineering, 33(1), Article 04016028. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000461
Kock, N. (2015). Common method bias in PLS-SEM: A full collinearity assessment approach. International Journal of e-Collaboration, 11(4), 1–10. https://doi.org/10.4018/ijec.2015100101
Kosnik, L. R. (2014). Determinants of contract completeness: An environmental regulatory application. International Review of Law and Economics, 37, 198–208. https://doi.org/10.1016/j.irle.2013.11.001
Krishnan, R., Martin, X., & Noorderhaven, N. G. (2006). When does trust matter to alliance performance?. Academy of Management Journal, 49(5), 894–917. https://doi.org/10.5465/amj.2006.22798171
Kujala, J., Nystén-Haarala, S., & Nuottila, J. (2015). Flexible contracting in project business. International Journal of Managing Projects in Business, 8(1), 92–106. https://doi.org/10.1108/IJMPB-10-2013-0062
Laan, A., Voordijk, H., & Dewulf, G. (2011). Reducing opportunistic behaviour through a project alliance. International Journal of Managing Projects in Business, 4(4), 660–679. https://doi.org/10.1108/17538371111164065
Lai, K. H., Bao, Y., & Li, X. (2008). Channel relationship and business uncertainty: evidence from the Hong Kong market. Industrial Marketing Management, 37(6), 713–724. https://doi.org/10.1016/j.indmarman.2007.05.017
Lindell, M. K., & Whitney, D. J. (2001). Accounting for common method variance in cross-sectional research designs. Journal of Applied Psychology, 86(1), 114–121. https://doi.org/10.1037/0021-9010.86.1.114
Ling, F. Y. Y., Ong, S. Y., Ke, Y., Wang, S., & Zou, P. (2014). Drivers and barriers to adopting relational contracting practices in public projects: Comparative study of Beijing and Sydney. International Journal of Project Management, 32(2), 275–285. https://doi.org/10.1016/j.ijproman.2013.04.008
Long, Y., Li, P., & You, B. (2014). Knowledge transfer, governance mechanisms in alliance and environmental uncertainty: an empirical study. Chinese Management Studies, 8(3), 438–472. https://doi.org/10.1108/CMS-07-2013-0129
Lorenz, A., & Veer, T. (2019). Once bitten, less shy? The influence of prior misappropriation experience on R&D collaboration. Industry and Innovation, 26(1), 31–56. https://doi.org/10.1080/13662716.2017.1403891
Lu, P., Qian, L., Chu, Z., & Xu, X. (2016). Role of opportunism and trust in construction projects: empirical evidence from China. Journal of Management in Engineering, 32(2), Article 05015007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000401
Lu, W., & Guo, W. (2019). The effect of task conflict on relationship quality: The mediating role of relational behavior. Negotiation and Conflict Management Research, 12(4), 297–321. https://doi.org/10.1111/ncmr.12150
Lui, S. S., Wong, Y. Y., & Liu, W. (2009). Asset specificity roles in interfirm cooperation: Reducing opportunistic behavior or increasing cooperative behavior?. Journal of Business Research, 62(11), 1214–1219. https://doi.org/10.1016/j.jbusres.2008.08.003
Luo, Y. (2006). Opportunism in inter-firm exchanges in emerging markets. Management and Organization Review, 2(1), 121–147. https://doi.org/10.1111/j.1740-8784.2006.00032.x
Nystén-Haarala, S., Lee N., & Lehto, J. (2010). Flexibility in contract terms and contracting processes. International Journal of Managing Projects in Business, 3(3), 462–478. https://doi.org/10.1108/17538371011056084
Ortiz-González, J. I., Pellicer, E., & Molenaar, K. R. (2018). Management of time and cost contingencies in construction projects: a contractor perspective. Journal of Civil Engineering and Management, 24(3), 254–264. https://doi.org/10.3846/jcem.2018.1643
Pang, H. Y., Cheung, S .O., Choi, M. C., & Chu, S. Y. (2015). Opportunism in construction contracting: minefield and manifestation. International Journal of Project Organisation and Management, 7(1), 31–55. https://doi.org/10.1504/IJPOM.2015.068004
Plambeck, E. L., & Taylor, T. A. (2007). Implications of renegotiation for optimal contract flexibility and investment. Management Science, 53(12), 1872–1886. https://doi.org/10.1287/mnsc.1070.0731
Podsakoff, P. M., Podsakoff, N. P., Williams, L. J., Huang, C., & Yang, J. (2024). Common method bias: It’s bad, it’s complex, it’s widespread, and it’s not easy to fix. Annual Review of Organizational Psychology and Organizational Behavior, 11(1), 17–61. https://doi.org/10.1146/annurev-orgpsych-110721-040030
Poppo, L., Zhou, K. Z., & Li, J. J. (2016). When can you trust “trust”? Calculative trust, relational trust, and supplier performance. Strategic Management Journal, 37(4), 724–741. https://doi.org/10.1002/smj.2374
Poppo, L., Zhou, K. Z., & Ryu, S. (2008a). Alternative origins to interorganizational trust: An interdependence perspective on the shadow of the past and the shadow of the future. Organization Science, 19(1), 39–55. https://doi.org/10.1287/orsc.1070.0281
Poppo, L., Zhou, K. Z., & Zenger, T. R. (2008b). Examining the conditional limits of relational governance: Specialized assets, performance ambiguity, and long‐standing ties. Journal of Management Studies, 45(7), 1195–1216. https://doi.org/10.1111/j.1467-6486.2008.00779.x
Schepker, D. J., Oh, W. Y., Martynov, A., & Poppo, L. (2014). The many futures of contracts moving beyond structure and safeguarding to coordination and adaptation. Journal of Management, 40(1), 193–225. https://doi.org/10.1177/0149206313491289
Serrador, P., & Turner, R. (2015). The relationship between project success and project efficiency. Project Management Journal, 46(1), 30–39. https://doi.org/10.1002/pmj.21468
Shahrara, N., Çelik, T., & Gandomi, A. H. (2017). Risk analysis of BOT contracts using soft computing. Journal of Civil Engineering and Management, 23(2), 232–240. https://doi.org/10.3846/13923730.2015.1068844
Shi, C., Chen, Y., You, J., & Yao, H. (2018). Asset specificity and contractors’ opportunistic behavior: Moderating roles of contract and trust. Journal of Management in Engineering, 34(5), Article 04018026. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000632
Skarmeas, D., & Robson, M. J. (2008). Determinants of relationship quality in importer–exporter relationships. British Journal of Management, 19(2), 171–184. https://doi.org/10.1111/j.1467-8551.2007.00537.x
Song, H., Zhu, F., Klakegg, O. J., & Wang, P. (2018). Relationship between contractual flexibility and contractor’s cooperative behavior: The mediating effect of justice perception. International Journal of Managing Projects in Business, 11(2), 382–405. https://doi.org/10.1108/IJMPB-07-2017-0088
Susarla, A. (2012). Contractual flexibility, rent seeking, and renegotiation design: An empirical analysis of information technology outsourcing contracts. Management Science, 58(7), 388–1407. https://doi.org/10.1287/mnsc.1110.1493
Tan, Z., & Yang, H. (2012). Flexible build-operate-transfer contracts for road franchising under demand uncertainty. Transportation Research Part B: Methodological, 46(10), 1419–1439. https://doi.org/10.1016/j.trb.2012.07.001
Teraji, S. (2008). Culture, effort variability, and hierarchy. The Journal of Socio-Economics, 37(1), 157–166. https://doi.org/10.1016/j.socec.2006.12.028
Tyssen, A. K., Wald, A., & Heidenreich, S. (2014). Leadership in the context of temporary organizations: A study on the effects of transactional and transformational leadership on followers’ commitment in projects. Journal of Leadership & Organizational Studies, 21(4), 376–393. https://doi.org/10.1177/1548051813502086
Um, K. H., & Kim, S. M. (2018). Collaboration and opportunism as mediators of the relationship between NPD project uncertainty and NPD project performance. International Journal of Project Management, 36(4), 659–672. https://doi.org/10.1016/j.ijproman.2018.01.006
Wang, H. C., He, J., & Mahoney, J. T. (2009). Firm‐specific knowledge resources and competitive advantage: the roles of economic‐and relationship‐based employee governance mechanisms. Strategic Management Journal, 30(12), 1265–1285. https://doi.org/10.1002/smj.787
Williams, P., Ashill, N. J., Naumann, E., & Jackson, E. (2015). Relationship quality and satisfaction: customer-perceived success factors for on-time projects. International Journal of Project Management, 33(8), 1836–1850. https://doi.org/10.1016/j.ijproman.2015.07.009
Williamson, O. E. (1985). The economic institutions of capitalism. Free Press.
Williamson, O. E. (1996). The mechanisms of governance. Oxford University Press. https://doi.org/10.1093/oso/9780195078244.001.0001
Wu, C. L., Fang, D. P., Liao, P. C., Xue, J. W., Li, Y., & Wang, T. (2015). Perception of corporate social responsibility: The case of Chinese international contractors. Journal of Cleaner Production, 107, 185–194. https://doi.org/10.1016/j.jclepro.2015.04.143
Wu, A. H., Wang, Z., & Chen, S. (2017). Impact of specific investments, governance mechanisms and behaviors on the performance of cooperative innovation projects. International Journal of Project Management, 35(3), 504–515. https://doi.org/10.1016/j.ijproman.2016.12.005
Wu, G., Zhao, X., Zuo, J., & George, Z. (2018). Effects of contractual flexibility on conflict and project success in megaprojects. International Journal of Conflict Management, 29(2), 253–278. https://doi.org/10.1108/IJCMA-06-2017-0051
Wu, G., Zheng, J., Zhao, X., & Zuo, J. (2020). How does strength of ties influence project performance in Chinese megaprojects? A conflict-based perspective. International Journal of Conflict Management, 31(5), 753–780. https://doi.org/10.1108/IJCMA-09-2019-0150
Xu, Y., Chong, H. Y., & Chi, M. (2022). Impact of contractual flexibility on BIM-enabled PPP project performance during the construction phase. Journal of Infrastructure Systems, 28(1), Article 04021057. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000671
Xue, J., Shen, G. Q., Deng, X., Ogungbile, A. J., & Chu, X. (2023). Evolution modeling of stakeholder performance on relationship management in the dynamic and complex environments of megaprojects. Engineering, Construction and Architectural Management, 30(4), 1536–1557. https://doi.org/10.1108/ECAM-06-2021-0504
Yang, J., & Cheng, Q. (2020). The impact of organisational resilience on construction project success: Evidence from large-scale construction in China. Journal of Civil Engineering and Management, 26(8), 775–788. https://doi.org/10.3846/jcem.2020.13796
Yen, Y. X., & Hung, S. W. (2017). The influences of suppliers on buyer market competitiveness: An opportunism perspective. Journal of Business & Industrial Marketing, 32(1), 18–29. https://doi.org/10.1108/JBIM-08-2015-0151
Yli-Renko, H., Sapienza, H. J. & Hay, M. (2001). The role of contractual governance flexibility in realizing the outcomes of key customer relationships. Journal of Business Venturing, 16(6), 529–555. https://doi.org/10.1016/S0883-9026(99)00062-2
Yoon, J., & Yu, I. (2019). Estimating normal duration of renovation for multistory apartment building considering extension-type renovation projects. Journal of Civil Engineering and Management, 25(2), 156–167. https://doi.org/10.3846/jcem.2019.8024
You, J., Chen, Y., Wang, W., & Shi, C. (2018). Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts. International Journal of Project Management, 36(5), 795–807. https://doi.org/10.1016/j.ijproman.2018.03.002
Zhang, L., & Qian, Q. (2017). How mediated power affects opportunism in owner-contractor relationships: The role of risk perceptions. International Journal of Project Management, 35(3), 516–529. https://doi.org/10.1016/j.ijproman.2016.12.003
Zhang, Z., Min, M., Cai, X., & Qiu, H. (2022). Mitigating the negative performance effect of project complexity through an informal mechanism: The conditional mediating role of knowledge hiding. International Journal of Project Management, 40(3), 192–204. https://doi.org/10.1016/j.ijproman.2022.01.002
Zheng, X., Lu, Y., & Chang, R. (2019). Governing behavioral relationships in megaprojects: Examining effect of three governance mechanisms under project uncertainties. Journal of Management in Engineering, 35(5), Article 04019016. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000701
Zhou, K. Z., & Poppo, L. (2010). Exchange hazards, relational reliability, and contracts in China: The contingent role of legal enforceability. Journal of International Business Studies, 41(5), 861–881. https://doi.org/10.1057/jibs.2010.7
Zhou, K. Z., Zhang, Q., Sheng, S., Xie, E., & Bao, Y. (2014). Are relational ties always good for knowledge acquisition? Buyer–supplier exchanges in China. Journal of Operations Management, 32(3), 88–98. https://doi.org/10.1016/j.jom.2014.01.001
Zollo, M., Reuer, J. J., & Singh, H. (2002). Interorganizational routines and performance in strategic alliances. Organization Science, 13(6), 701–713. https://doi.org/10.1287/orsc.13.6.701.503
Zwikael, O., & Smyrk, J. (2015). Project governance: Balancing control and trust in dealing with risk. International Journal of Project Management, 33(4), 852–862. https://doi.org/10.1016/j.ijproman.2014.10.012
View article in other formats
Published
Issue
Section
Copyright
Copyright (c) 2025 The Author(s). Published by Vilnius Gediminas Technical University.
License
This work is licensed under a Creative Commons Attribution 4.0 International License.