Share:


Understanding the changes in construction project managers’ competences through resume data mining

    Junping Zheng Affiliation
    ; Maoshan Qiang Affiliation

Abstract

Construction project managers (CPMs) play a crucial role in project management. Using nearly 250,000 online resumes, this study aims to identify the major aspects and explore the prevalence trend of competences required by CPMs in real work. A data mining approach, Dynamic Topic Model (DTM), was adopted and ten aspects of CPMs’ competences are disclosed. The results of Mann-Kendall tests suggest that among technical skills, work experience and the ability of information technology application are gaining increasing attention rather than professional skill. Moreover, human skills, key managerial competences (i.e., procurement management, risk management and site management) and organizational skill are highlighted. Theoretically, the results provide a systematic review on the real-world competence requirements and their changing trends for CPMs. In practice, these findings can not only be utilized to help students in relevant major and practitioners benchmark their own competences with real-world requirements, but also assist construction firms in formulating more informed talent strategies.

Keyword : project manager’s competences, changes in competences, construction industry, resume data mining, Dynamic Topic Model (DTM)

How to Cite
Zheng, J., & Qiang, M. (2022). Understanding the changes in construction project managers’ competences through resume data mining. Journal of Civil Engineering and Management, 28(4), 305–319. https://doi.org/10.3846/jcem.2022.16579
Published in Issue
Mar 24, 2022
Abstract Views
1572
PDF Downloads
1013
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

References

Abbas, C., Mounir, E. A., Claire, T., & Issam, S. (2016). Dual assessment framework to evaluate LEED-certified facilities’ occupant satisfaction and energy performance: Macro and micro approaches. Journal of Architectural Engineering, 22(4), A4015003. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000186

Ahadzie, D. K., Proverbs, D. G., & Sarkodie-Poku, I. (2014). Competencies required of project managers at the design phase of mass house building projects. International Journal of Project Management, 32(6), 958–969. https://doi.org/10.1016/j.ijproman.2013.10.015

Ahsan, K., Ho, M., & Khan, S. (2013). Recruiting project managers: A comparative analysis of competencies and recruitment signals from job advertisements. Project Management Journal, 44(5), 36–54. https://doi.org/10.1002/pmj.21366

Alsheyab, M. A. T. (2022). Recycling of construction and demolition waste and its impact on climate change and sustainable development. International Journal of Environmental Science and Technology, 19, 2129–2138. https://doi.org/10.1007/s13762-021-03217-1

Alvarenga, J. C., Branco, R. R., Guedes, A. L. A., Soares, C. A. P., & Silva, W. d. S. e. (2020). The project manager core competencies to project success. International Journal of Managing Projects in Business, 13(2), 277–292. https://doi.org/10.1108/IJMPB-12-2018-0274

Barde, B. V., & Bainwad, A. M. (2017). An overview of topic modeling methods and tools. In Proceedings of the 2017 International Conference on Intelligent Computing and Control Systems (ICICCS 2017) (pp. 745–750), Madurai, India. https://doi.org/10.1109/ICCONS.2017.8250563

Blei, D. M. (2012). Probabilistic topic models. Communications of the ACM, 55(4), 77–84. https://doi.org/10.1145/2133806.2133826

Blei, D. M., & Lafferty, J. D. (2006). Dynamic topic models. In Proceedings of the 23rd International Conference on Machine Learning (ICML’06) (pp. 113–120), Carnegie Mellon University in Pittsburgh, Pennsylvania. https://doi.org/10.1145/1143844.1143859

Blumberg, B., Cooper, D. R., & Schindler, P. S. (2011). Business research methods (3rd ed.). McGraw-Hill Higher Education.

Brown, K. (2000). Developing project management skills: A service learning approach. Project Management Journal, 31(4), 53–58. https://doi.org/10.1177/875697280003100408

Cheng, M. I., Dainty, A. R. J., & Moore, D. R. (2005). What makes a good project manager?. Human Resource Management Journal, 15(1), 25–37. https://doi.org/10.1111/j.1748-8583.2005.tb00138.x

Chipulu, M., Neoh, J. G., Ojiako, U., & Williams, T. (2013). A multidimensional analysis of project manager competences. IEEE Transactions on Engineering Management, 60(3), 506–517. https://doi.org/10.1109/TEM.2012.2215330

Clarke, N. (2010). Emotional intelligence and its leadership and key project manager. Project Management Journal, 41(2), 5–20. https://doi.org/10.1002/pmj.20162

Crawford, L. (2005). Senior management perceptions of project management competence. Internation Journal of Project Management, 23(1), 7–16. https://doi.org/10.1016/j.ijproman.2004.06.005

Crawford, L. (2007). Global body of project management knowledge and standards. Wiley. https://doi.org/10.1002/9780470172391.ch46

de Araújo, M. C. B., Alencar, L. H., & de Miranda Mota, C. M. (2017). Project procurement management: A structured literature review. International Journal of Project Management, 35(3), 353–377. https://doi.org/10.1016/j.ijproman.2017.01.008

de Carvalho, M. M., & Rabechini Junior, R. (2015). Impact of risk management on project performance: The importance of soft skills. International Journal of Production Research, 53(2), 321–340. https://doi.org/10.1080/00207543.2014.919423

Denter, N., Caferoglu, H., & Moehrle, M. G. (2019). Applying dynamic topic modeling for understanding the evolution of the rfid technology. In Proceedings of Portland International Conference on Management of Engineering and Technology (PICMET 2019): Technology Management in the World of Intelligent Systems, Portland, OR, USA. https://doi.org/10.23919/PICMET.2019.8893914

Di Maddaloni, F., & Davis, K. (2018). Project manager’s perception of the local communities’ stakeholder in megaprojects. An empirical investigation in the UK. International Journal of Project Management, 36(3), 542–565. https://doi.org/10.1016/j.ijproman.2017.11.003

Diallo, A., & Thuillier, D. (2005). The success of international development projects, trust and communication: an African perspective. International Journal of Project Management, 23(3), 237–252. https://doi.org/10.1016/j.ijproman.2004.10.002

Dias, M., Tereso, A., Braga, A. C., & Fernandes, A. G. (2014). The key project managers’ competences for different types of projects. In A. Ro-cha, A. M. Correia, F. B. Tan, & K. A. Stroetmann (Eds.), New perspectives in information systems and technologies, Volume 1: Advances in intelligent systems and computing: Vol 275 (pp. 359–368). Springer, Cham. https://doi.org/10.1007/978-3-319-05951-8_34

Ding, Z., Wang, Y., & Zou, P. X. W. (2016). An agent based environmental impact assessment of building demolition waste management: Conventional versus green management. Journal of Cleaner Production, 133(1), 1136–1153. https://doi.org/10.1016/j.jclepro.2016.06.054

Dziekonski, K. (2017). Project managers’ competencies model for construction industry in Poland. In Proceedings of 7th International Conference on Engineering, Poject, and Production Management (pp. 174–181). https://doi.org/10.1016/j.proeng.2017.03.157

Dziobczenski, P. R. N., Person, O., & Meriläinen, S. (2018). Designing career paths in graphic design: A document analysis of job advertisements for graphic design positions in finland. Design Journal, 21(3), 349–370. https://doi.org/10.1080/14606925.2018.1444874

El-Sabaa, S. (2001). The skills and career path of an effective project manager. International Journal of Project Management, 19(1), 1–7. https://doi.org/10.1016/S0263-7863(99)00034-4

Eraut, M. (2011). Informal learning in the workplace: evidence on the real value of work‐based learning (WBL). Development and Learning in Organizations: An International Journal, 25(5), 8–12. https://doi.org/10.1108/14777281111159375

Fajar Sitohang, Y., Pratami, D., & Fuad Bay, A. (2020). Competency evaluation of project manager performance in network construction projects. In 2020 Fifth International Conference on Informatics and Computing (ICIC), Gorontalo, Indonesia. https://doi.org/10.1109/ICIC50835.2020.9288580

Gangwar, M., & Goodrum, P. M. (2005). The effect of time on safety incentive programs in the US construction industry. Construction Management and Economics, 23(8), 851–859. https://doi.org/10.1080/01446190500184527

Gharouni Jafari, K., & Noorzai, E. (2021). Selecting the most appropriate project manager to improve the performance of the occupational groups in road construction projects in warm regions. Journal of Construction Engineering and Management, 147(10), 04021131. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002151

Global Infrastucture Hub. (2017). Global infrastructure outlook. https://www.oxfordeconomics.com/recent-releases/99f4fa86-­a314-4762-97c6-fac8bdcbe40a

Hefley, W. E., & Bottion, M. (2021). Skills of junior project management professionals and project success achieved by them. International Journal of Information Systems and Project Management, 9(1), 56–75. https://doi.org/10.12821/ijispm090103

Heinrich, K., & Sugumaran, V. (2015). Welcome to the party: Modeling the topic evolution of political parties in microblogs using dynamic topic models. In V. Sugumaran (Ed.), Recent advances in intelligent technologies and information systems (pp. 63–82). IGI Global. https://doi.org/10.4018/978-1-4666-6639-9.ch004

Hodgson, D. E., & Paton, S. (2016). Understanding the professional project manager: Cosmopolitans, locals and identity work. International Journal of Project Management, 34(2), 352–364. https://doi.org/10.1016/j.ijproman.2015.03.003

Ibem, E. O., & Laryea, S. (2014). Survey of digital technologies in procurement of construction projects. Automation in Construction, 46, 11–21. https://doi.org/10.1016/j.autcon.2014.07.003

Ibrahim, M. W., Hanna, A., & Kievet, D. (2020). Quantitative comparison of project performance between project delivery systems. Journal of Management in Engineering, 36(6), 04020082. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000837

Jiang, H., Qiang, M., & Lin, P. (2016). A topic modeling based bibliometric exploration of hydropower research. Renewable and Sustainable Energy Reviews, 57, 226–237. https://doi.org/10.1016/j.rser.2015.12.194

Jiang, H., Qiang, M., Lin, P., Wen, Q., & Xia, B. (2017). Framing the Brahmaputra River hydropower development: Different concerns in riparian and international media reporting. Water Policy, 19(3), 496–512. https://doi.org/10.2166/wp.2017.056

Jiang, H., Qiang, M., & Zhang, D. (2018). Climate change communication in an online Q & A community: A case study of Quora. Sustainability, 10(5), 1509. https://doi.org/10.3390/su10051509

Kereri, J. O., & Harper, C. M. (2019). Social networks and construction teams: Literature review. Journal of Construction Engineering and Management, 145(4), 03119001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001628

Kerzner, H. (2018). The future of project management. Revista de Gestao e Projectos, 9(3), 151–158. https://doi.org/10.5585/gep.v9i3.10685

Kim, C., Park, T., Lim, H., & Kim, H. (2013). On-site construction management using mobile computing technology. Automation in Construction, 35, 415–423. https://doi.org/10.1016/j.autcon.2013.05.027

Konanahalli, A., & Oyedele, L. (2016). Emotional intelligence and British expatriates’ cross-cultural adjustment in international construction projects. Construction Management and Economics, 34(11), 751–768. https://doi.org/10.1080/01446193.2016.1213399

Kopeckova, M., & Brno, M. U. (2015). The importance of technical competences for successful project management. In Proceedings of X International Conference on Applied Business Research (ICABR 2015) (pp. 501–506).

Lai, C., Hsu, J. S., & Li, Y. (2018). Leadership, regulatory focus and information systems developement project team performance. International Journal of Project Management, 36(3), 566–582. https://doi.org/10.1016/j.ijproman.2017.11.001

Lee, N., & Schaufelberger, J. E. (2014). Risk management strategies for privatized infrastructure projects: Study of the Build–Operate–Transfer approach in East Asia and the Pacific. Journal of Management in Engineering, 30(3), 05014001. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000225

Leung, M., Yee Shan Isabelle Chan, & Dongyu, C. (2011). Structural linear relationships between job stress, burnout, physiological stress, and performance of construction project managers. Engineering, Construction and Architectural Management, 18(3), 312–328. https://doi.org/10.1108/09699981111126205

Leybourne, S. A. (2007). The changing bias of project management research: A consideration of the literatures and an application of extant theory. Project Management Journal, 38(1), 61–73. https://doi.org/10.1177/875697280703800107

Li, T. H. Y., Ng, S. T., & Skitmore, M. (2013). Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach. Automation in Construction, 29, 123–135. https://doi.org/10.1016/j.autcon.2012.09.007

Li, W., Saigo, H., Tong, B., & Suzuki, E. (2021). Topic modeling for sequential documents based on hybrid inter-document topic dependency. Journal of Intelligent Information Systems, 56(3), 435–458. https://doi.org/10.1007/s10844-020-00635-4

Liikamaa, K. (2015). Developing a project manager’s competencies: A collective view of the most important competencies. Procedia Manufacturing, 3, 681–687. https://doi.org/10.1016/j.promfg.2015.07.305

Lima, L., Trindade, E., Alencar, L., Alencar, M., & Silva, L. (2021). Sustainability in the construction industry: A systematic review of the literature. Journal of Cleaner Production, 289, 125730. https://doi.org/10.1016/j.jclepro.2020.125730

Mann, H. B. (1945). Nonparametric tests against trend. Econometrica, 13(3), 245–259. https://doi.org/10.2307/1907187

Maqbool, R., Sudong, Y., Manzoor, N., & Rashid, Y. (2017). The impact of emotional intelligence, project managers’ competencies, and transformational leadership on project success: An empirical perspective. Project Management Journal, 48(3), 58–75. https://doi.org/10.1177/875697281704800304

McGrath, J., & Kostalova, J. (2020). Project management trends and new challenges 2020+. In P. Jedlicka, P. Maresova, K. Firlej, & I. Soukal (Eds.), Konference Hradec economic days 2020: Vol. 10 (pp. 534–542). https://doi.org/10.36689/uhk/hed/2020-01-061

Meng, X. (2012). The effect of relationship management on project performance in construction. International Journal of Project Management, 30(2), 188–198. https://doi.org/10.1016/j.ijproman.2011.04.002

Meng, X., & Boyd, P. (2017). The role of the project manager in relationship management. International Journal of Project Management, 35(5), 717–728. https://doi.org/10.1016/j.ijproman.2017.03.001

Montenegro, A., Dobrota, M., Todorovic, M., Slavinski, T., & Obradovic, V. (2021). Impact of construction project managers’ emotional intelligence on project success. Sustainability, 13(19), 10804. https://doi.org/10.3390/su131910804

Moradi, S., Kähkönen, K., Klakegg, O. J., & Aaltonen, K. (2021). A competency model for the selection and performance improvement of project managers in collaborative construction projects: Behavioral studies in Norway and Finland. Buildings, 11(1), 4. https://doi.org/10.3390/buildings11010004

Morris, P. W. G. (2013). Reconstructing project management reprised: a knowledge perspective. Project Management Journal, 44(5), 6–23. https://doi.org/10.1002/pmj.21369

Müller, R., & Turner, R. (2010a). Leadership competency profiles of successful project managers. International Journal of Project Management, 28(5), 437–448. https://doi.org/10.1016/j.ijproman.2009.09.003

Müller, R., & Turner, R. (2010b). Attitudes and leadership competences for project success. Baltic Journal of Management, 5(3), 307–329. https://doi.org/10.1108/17465261011079730

Nawari, N. O. (2012). BIM standard in off-site construction. Journal of Architectural Engineering, 18(2), 107–113. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000056

Neuman, W. L. (2011). Social research methods (6th ed.). Pearson Education Limited.

Nijhuis, S., Vrijhoef, R., & Kessels, J. (2018). Tackling project management competence research. Project Management Journal, 49(3), 62–81. https://doi.org/10.1177/8756972818770591

O’Brien, W. J., Hurley, M. J., Mondragon Solis, F. A., & Nguyen, T. (2011). Cognitive task analysis of superintendent’s work: Case study and critique of supporting information technologies. Electronic Journal of Information Technology in Construction, 16, 529–556.

Odusami, K. T. (2002). Perceptions of construction professionals concerning important skills of effective project leaders. Journal of Management in Engineering, 18(2), 61–67. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(61)

Oyegoke, A. S., Dickinson, M., Khalfan, M. M. A., McDermott, P., & Rowlinson, S. (2009). Construction project procurement routes: an in‐depth critique. International Journal of Managing Projects in Business, 2(3), 338–354. https://doi.org/10.1108/17538370910971018

Pant, I., & Baroudi, B. (2008). Project management education: The human skills imperative. International Journal of Project Management, 26, 124–128. https://doi.org/10.1016/j.ijproman.2007.05.010

Podgorska, M., & Pichlak, M. (2019). Analysis of project managers’ leadership competencies: Project success relation: what are the competencies of Polish project leaders?. International Journal of Managing Projects in Business, 12(4), 869–887. https://doi.org/10.1108/IJMPB-08-2018-0149

Project Management Institute. (2014). Rally the talent to win: Transforming strategy into reality. https://www.pmi.org/-/media/pmi/documents/public/pdf/learning/thought-leadership/rally-the-talent-to-win.pdf?v=023c6736-8e9e-4379-ac2b-c70a7e1f5ceb

Project Management Institute. (2018). Success in disruptive times: Expanding the value delivery landscape to address the high cost of low performance. https://www.pmi.org/-/media/pmi/documents/public/pdf/learning/thought-leadership/pulse/pulse-of-the-profession-2018.pdf

Project Management Institute. (2019). The project manager of the future: Developing digital-age project management skills to thrive in disruptive times. https://www.pmi.org/-/media/pmi/documents/public/pdf/learning/thought-leadership/pulse/digital-pm-skills.pdf?v=234f58d6-0d0b-4451-bc3f-19f7ddbb92da&sc_lang_temp=en

Rahmani, F., Maqsood, T., & Khalfan, M. (2017). An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(4), 593–609. https://doi.org/10.1108/ECAM-03-2016-0058

Ribeiro, A., Amaral, A., & Barros, T. (2021). Project manager competencies in the context of the Industry 4.0. Procedia Computer Science, 181, 803–810. https://doi.org/10.1016/j.procs.2021.01.233

Roberts, M. E., Stewart, B. M., Tingley, D., & Airoldi, E. M. (2013). The structural topic model and applied social science. Neural Information Processing Society.

Rosen-Zvi, M., Griffiths, T., Steyvers, M., & Smyth, P. (2004). The author-topic model for authors and documents. In Proceedings of the 20th Conference on Uncertainty in Artificial Intelligence (pp. 33–44).

Ruparathna, R., & Hewage, K. (2015). Review of contemporary construction procurement practices. Journal of Management in Engineering, 31(3), 04014038. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000279

Sang, P., Liu, J., Zhang, L., Zheng, L., Yao, H., & Wang, Y. (2018). Effects of project manager competency on green construction performance: The Chinese context. Sustainability, 10(10), 3406. https://doi.org/10.3390/su10103406

Savelsbergh, C. M. J. H., Havermans, L. A., & Storm, P. (2016). Development paths of project managers: What and how do project managers learn from their experiences?. International Journal of Project Management, 34(4), 559–569. https://doi.org/10.1016/j.ijproman.2016.02.005

Schoonwinkel, S., Fourie, C. J., & Conradie, P. D. F. (2016). A risk and cost management model for changes during the construction phase of a civil engineering oroject. Journal of the South African Institution of Civil Engineering, 58(4), 21–28. https://doi.org/10.17159/2309-8775/2016/v58n4a3

Senaratne, S., & Aparna, S. (2015). Construction project leadership across the team development process. Built Environment Project and Asset Management, 5(1), 69–88. https://doi.org/10.1108/BEPAM-10-2012-0049

Siraj, N. B., & Fayek, A. R. (2019). Risk identification and common risks in construction: Literature review and content analysis. Journal of Con-struction Engineering and Management, 145(9), 03119004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001685

Skipper, C. O., Asce, M., Bell, L. C., & Asce, F. (2006). Assessment with 360° evaluations of leadership behavior in construction project managers. Journal of Management in Engineering, 22(2), 75–81. https://doi.org/10.1061/(ASCE)0742-597X(2006)22:2(75)

Smith, N. J., Merna, T., & Jobling, P. (2006). Managing risk in construction projects (2nd ed.). Blackwell Science.

Smyth, H. (2015). Relationship management and the management of projects. Routledge, Oxon. https://doi.org/10.4324/9781315889986

Takey, S. M., & de Carvalho, M. M. De. (2015). Competency mapping in project management: An action research study in an engineering company. International Journal of Project Management, 33(4), 784–796. https://doi.org/10.1016/j.ijproman.2014.10.013

Tang, J., & Zhang, J. (2010). Modeling the evolution of associated data. Data & Knowledge Engineering, 69(9), 965–978. https://doi.org/10.1016/j.datak.2010.03.009

Taroun, A. (2014). Towards a better modelling and assessment of construction risk: Insights from a literature review. International Journal of Project Management, 32(1), 101–115. https://doi.org/10.1016/j.ijproman.2013.03.004

Teerajetgul, W., & Chareonngam, C. (2008). Tacit knowledge utilization in Thai construction projects. Journal of Knowledge Management, 12(1), 164–174. https://doi.org/10.1108/13673270810852467

Toor, S., & Ofori, G. (2008). Developing construction professionals of the 21st century: Renewed vision for leadership. Jourmal of Professional Issues in Engineering Education and Practice, 134(3), 279–287. https://doi.org/10.1061/(ASCE)1052-3928(2008)134:3(279)

Wearne, S. (2004). Professional engineers’ needs for managerial skills and expertise. Proceedings of the Institution of Civil Engineers – Civil Engineering, 157(1), 44–48. https://doi.org/10.1680/cien.2004.157.1.44

Wen, Q., Qiang, M., & An, N. (2017). Collaborating with construction management consultants in project execution: Responsibility delegation and capability integration. Journal of Construction Engineering and Management, 143(7), 04017021. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001312

Wen, Q., Qiang, M., & Gloor, P. (2018). Speeding up decision-making in project environment: The effects of decision makers’ collaboration net-work dynamics. Internation Journal of Project Management, 36(5), 819–831. https://doi.org/10.1016/j.ijproman.2018.02.006

Yang, L., Huang, C., & Wu, K. (2011). The association among project manager’s leadership style, teamwork and project success. International Journal of Project Management, 29(3), 258–267. https://doi.org/10.1016/j.ijproman.2010.03.006

Yap, J. B. H., & Shavarebi, K. (2019). Enhancing project delivery performances in construction through experiential learning and personal con-structs: competency development. International Journal of Construction Management. https://doi.org/10.1080/15623599.2019.1629864

Yepes, V., Pellicer, E., & Ortega, A. J. (2012). Designing a benchmark indicator for managerial competences in construction at the graduate level. Journal of Professional Issues in Engineering Education and Practice, 138(1), 48–55. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000075

Zarei, B., Sharifi, H., & Chaghouee, Y. (2018). Delay causes analysis in complex construction projects: a Semantic Network Analysis approach. Production Planning & Control, 29(1), 29–40. https://doi.org/10.1080/09537287.2017.1376257

Zhang, F., Zuo, J., & Zillante, G. (2013). Identification and evaluation of the key social competencies for Chinese construction project managers. International Journal of Project Management, 31(5), 748–759. https://doi.org/10.1016/j.ijproman.2012.10.011

Zhao, X., Hwang, B., & Lee, H. N. (2016). Identifying critical leadership styles of project managers for green building projects. International Journal of Construction Management, 16(2), 150–160. https://doi.org/10.1080/15623599.2015.1130602

Zhou, Z., Goh, Y. M., & Li, Q. (2015). Overview and analysis of safety management studies in the construction industry. Safety Science, 72, 337–350. https://doi.org/10.1016/j.ssci.2014.10.006

Zhou, H., Yu, H., & Hu, R. (2017). Topic evolution based on the probabilistic topic model: A review. Frontiers of Computer Science, 11(5), 786–802. https://doi.org/10.1007/s11704-016-5442-5

Zhou, H. T., Wang, H. W., & Zeng, W. (2018). Smart construction site in mega construction projects: A case study on island tunneling project of Hong Kong-Zhuhai-Macao Bridge. Frontiers of Engineering Management, 5(1), 78–87. https://doi.org/10.15302/J-FEM-2018075

Zuo, J., Zhao, X., Nguyen, Q. B. M., Ma, T., & Gao, S. (2018). Soft skills of construction project management professionals and project success factors: A structural equation model. Engineering Construction and Architectural Management, 25(3), 425–442. https://doi.org/10.1108/ECAM-01-2016-0016

Zwikael, O., & Ahn, M. J. (2011). The effectiveness of risk management: an analysis of project risk planning across industries and countries. Risk Analysis, 31(1), 25–37. https://doi.org/10.1111/j.1539-6924.2010.01470.x