Estimating the profitability of hydropower investments with a case study from Turkey

    Emre Caner Akcay Info
    Irem Dikmen Info
    M. Talat Birgonul Info
    David Arditi Info

Abstract

Energy demand has been increasing, but traditional sources of energy are depletable. New investments are needed in renewable energy production. Hydroelectric power plants are often considered a feasible renewable source of energy and are often organized as a public private partnerships (PPP). However, risk factors stemming from the macro environment as well as project conditions should be considered in performing feasibility studies. The objective of this study was to develop a method that can be used to predict the profitability of hydropower investments considering the relevant risk factors. To that end, a cash flow that represents the construction and operation period is set up, the risk fac­tors involved in such projects are identified, the impacts of these risk factors on the cash flow parameters are assessed, and Monte Carlo simulation is performed to estimate the net present value (NPV) of a hydropower investment. The proposed method was tested in a hydropower investment located in Turkey and generated credible results that could be of great benefit to potential investors operating in similar conditions. The primary contribution of this research is the creation of a method that allows investors to assess the profitability of a hydropower investment by using a stochastic approach.

Keywords:

renewable energy, hydropower investment, Monte Carlo simulation, cash flow

How to Cite

Estimating the profitability of hydropower investments with a case study from Turkey. (2017). Journal of Civil Engineering and Management, 23(8), 1002-1012. https://doi.org/10.3846/13923730.2017.1350877

Share

Published in Issue
November 20, 2017
Abstract Views
1109

View article in other formats

CrossMark check

CrossMark logo

Published

2017-11-20

Issue

Section

Articles

How to Cite

Estimating the profitability of hydropower investments with a case study from Turkey. (2017). Journal of Civil Engineering and Management, 23(8), 1002-1012. https://doi.org/10.3846/13923730.2017.1350877

Share