Vol 16 No 1 (2010)
Published: 2010-03-31
Articles
The driving factors of china's public‐private partnership projects in Metropolitian transportation systems: Public sector's viewpoint
Abstract 841 | PDF Downloads 572 | DOI https://doi.org/10.3846/jcem.2010.01
Page 5-18
The public sector's perspective on procuring public works projects – comparing the views of practitioners in Hong Kong and Australia
Abstract 618 | PDF Downloads 461 | DOI https://doi.org/10.3846/jcem.2010.02
Page 19-32
Risk assessment of construction projects
Abstract 4045 | PDF Downloads 2322 | DOI https://doi.org/10.3846/jcem.2010.03
Page 33-46
Subcontractor selection practices in international construction projects
Abstract 747 | PDF Downloads 825 | DOI https://doi.org/10.3846/jcem.2010.04
Page 47-56
Construction contractor prequalification from polish clients’ perspective
Abstract 585 | PDF Downloads 324 | DOI https://doi.org/10.3846/jcem.2010.05
Page 57-64
Influence of quality performance on clients’ patronage of indigenous and expatriate construction contractors in Nigeria
Abstract 496 | PDF Downloads 290 | DOI https://doi.org/10.3846/jcem.2010.06
Page 65-73
Customer behavior and decision making in the refurbishment industry‐a data mining approach
Abstract 770 | PDF Downloads 467 | DOI https://doi.org/10.3846/jcem.2010.07
Page 75-84
Precast concrete systems in developing vs. industrialized countries
Abstract 1004 | PDF Downloads 719 | DOI https://doi.org/10.3846/jcem.2010.08
Page 85-94
Global optimization of grillages using simulated annealing and high performance computing
Abstract 442 | PDF Downloads 667 | DOI https://doi.org/10.3846/jcem.2010.09
Page 95-101
Saosys toolbox as Matlab implementation in the elastic‐plastic analysis and optimal design of steel frame structures
Abstract 432 | PDF Downloads 401 | DOI https://doi.org/10.3846/jcem.2010.10
Page 103-121
Evaluation of PFWD as potential quality control tool of pavement layers
Abstract 502 | PDF Downloads 281 | DOI https://doi.org/10.3846/jcem.2010.11
Page 123-129
Design of people evacuation from rooms and buildings
Abstract 586 | PDF Downloads 376 | DOI https://doi.org/10.3846/jcem.2010.12
Page 131-139
Required additional heating power of building during intermitted heating
Abstract 457 | PDF Downloads 325 | DOI https://doi.org/10.3846/jcem.2010.13
Page 141-148
Non‐linear analysis of suspension bridges with flexible and rigid cables
Abstract 585 | PDF Downloads 483 | DOI https://doi.org/10.3846/jcem.2010.14
Page 149-154