JOURNAL CONTENT
Vol 30 No 2 (2024)
Published:
2024-02-06
Articles
Buffering policies for prefabricated construction supply chain subject to material lead time and activity duration uncertainties
Hui Lu, Dian Liu, Jue Li
Abstract 2261 |
PDF Downloads
586
| DOI
https://doi.org/10.3846/jcem.2024.20809
Page 99–113
Probabilistic management of pavement defects with image processing techniques
Felix Obunguta, Kakuya Matsushima, Junichi Susaki
Abstract 2187 |
PDF Downloads
573
| DOI
https://doi.org/10.3846/jcem.2024.20401
Page 114–132
The benefit evaluation framework of using performance-based contracting in urban road maintenance
Chun-Chieh Tseng, Jyh-Bin Yang
Abstract 2063 |
PDF Downloads
450
| DOI
https://doi.org/10.3846/jcem.2024.20491
Page 133–148
Determining concessionary items for “availability payment only” PPP projects: a holistic framework integrating value-for-money and social values
Yubo Guo, Chuan Chen, Xiaowei Luo, Igor Martek
Abstract 2274 |
PDF Downloads
556
| SM Downloads
184
| DOI
https://doi.org/10.3846/jcem.2024.20841
Page 149–167
Empirical study toward corporate legal compliance and anti-corruption for top construction engineering consulting firms
Jieh-Haur Chen, Tien-Sheng Chou, Jui-Pin Wang, Qin Rui Wong
Abstract 2440 |
PDF Downloads
698
| DOI
https://doi.org/10.3846/jcem.2024.19554
Page 168–181
Structural equation model-based performance measurement system for transferring PPP water projects: a China perspective
Chuan Chen, Jinchan Liu, Lanqian Zhang, Lin Huang
Abstract 2109 |
PDF Downloads
456
| DOI
https://doi.org/10.3846/jcem.2024.19788
Page 182–199
JournalContent
quicklinks
About Journal