JOURNAL CONTENT
Vol 29 No 2 (2023)
Published:
2023-01-23
Articles
Resource levelling in repetitive construction projects with interruptions: an integrated approach
Guyu Dai, Mingjuan Liao, Renqian Zhang
Abstract 2479 |
PDF Downloads
829
| DOI
https://doi.org/10.3846/jcem.2023.17568
Page 93–106
Comparative analysis on international construction and demolition waste management policies and laws for policy makers in China
Mingxue Ma, Vivian Wy Tam, Khoa N Le, Anthony Butera, Wengui Li, Xiangyu Wang
Abstract 4244 |
PDF Downloads
1409
| DOI
https://doi.org/10.3846/jcem.2023.16581
Page 107–130
Analysis of labor resources wastage in China’s real estate brokerage: from the perspective of opportunity costs
Qiuhong Zhao, Mingrui Ding, Chengfeng Wu, Yashuai Li
Abstract 2286 |
PDF Downloads
553
| DOI
https://doi.org/10.3846/jcem.2023.18356
Page 131–142
Study on flexural and demountable behavior of a modular light-gauge steel framed wall
Cong Liu, Xin Chen, Xiaoyong Mao, Lin He, Jian Yuan
Abstract 2114 |
PDF Downloads
507
| DOI
https://doi.org/10.3846/jcem.2023.18351
Page 143–156
Predictors to increase safety technology adoption in construction: an exploratory factor analysis for Malaysia
Jeffrey Boon Hui Yap, Karen Pei Han Lee, Martin Skitmore, Yoke Lian Lew, Wah Peng Lee, Danielle Lester
Abstract 2917 |
PDF Downloads
993
| DOI
https://doi.org/10.3846/jcem.2022.18053
Page 157–170
Integration of structural information within a BIM-based environment for seismic structural e-permits
Angelo Ciccone, Vittoria Ciotta, Domenico Asprone
Abstract 2238 |
PDF Downloads
532
| DOI
https://doi.org/10.3846/jcem.2023.18460
Page 171–193
JournalContent
quicklinks
About Journal