Vol 28 No 4 (2022)

Published: 2022-03-08

Articles

  • Effective allocation of manpower in the production of precast concrete elements with the use of metaheuristics

    Michał Podolski
    Abstract 2482 | PDF Downloads 873 | DOI https://doi.org/10.3846/jcem.2022.16383
    Page 247–260
  • Modeling of pavement roughness utilizing artificial neural network approach for Laos national road network

    Mohamed Gharieb, Takafumi Nishikawa, Shozo Nakamura, Khampaseuth Thepvongsa
    Abstract 2739 | PDF Downloads 990 | DOI https://doi.org/10.3846/jcem.2022.15851
    Page 261–277
  • Automatic identification and quantification of safety risks embedded in design stage: a BIM-enhanced approach

    Xiaer Xiahou, Kang Li, Funing Li, Zhenqi Zhang, Qiming Li, Yuan Gao
    Abstract 2804 | PDF Downloads 1134 | DOI https://doi.org/10.3846/jcem.2022.16560
    Page 278–291
  • Enhanced teacher-learning based algorithm in real size structural optimization

    Mohammad Sadegh Es-Haghi, Alireza Salehi, Alfred Strauss
    Abstract 2221 | PDF Downloads 608 | DOI https://doi.org/10.3846/jcem.2022.16387
    Page 292–304
  • Understanding the changes in construction project managers’ competences through resume data mining

    Junping Zheng, Maoshan Qiang
    Abstract 2914 | PDF Downloads 1224 | DOI https://doi.org/10.3846/jcem.2022.16579
    Page 305–319
  • Automatic safety evaluation and visualization of subway station excavation based on BIM-FEM/FDM integrated technology

    Ping Xie, Rongjun Zhang, Junjie Zheng, Ziqian Li
    Abstract 2538 | PDF Downloads 623 | DOI https://doi.org/10.3846/jcem.2022.16727
    Page 320–336
  • Corrigenda

  • Corrigendum: Embedded remote group environment through modification in MACBETH - an application of contractor’s selection in construction

    Ali Raza Khoso, Aminah Md Yusof, Zhen-Song Chen, Xian-Jia Wang, Mirosław J. Skibniewski, Nafees Ahmed Memon
    Abstract 1947 | PDF Downloads 417 | DOI https://doi.org/10.3846/jcem.2022.16861
    Page 337