Vol 26 No 5 (2020)

Published: 2020-05-07

Articles

  • A framework for evaluating an integrated BIM ROI based on preventing rework in the construction phase

    Myungdo Lee , Ung-Kyun Lee
    Abstract 3231 | PDF Downloads 1535 | DOI https://doi.org/10.3846/jcem.2020.12185
    Page 410-420
  • Understanding the structural behavior of historical buildings through its constructive phase evolution using H-BIM workflow

    Alfredo Calì , Poliana Dias de Moraes, Ângela Do Valle
    Abstract 2407 | PDF Downloads 958 | DOI https://doi.org/10.3846/jcem.2020.12612
    Page 421-434
  • Evaluating the safety performance of China’s provincial construction industries from 2009 to 2017

    Liangguo Kang, Chao Wu
    Abstract 1943 | PDF Downloads 823 | DOI https://doi.org/10.3846/jcem.2020.12646
    Page 435-446
  • Energy-saving building program evaluation with an integrated method under linguistic environment

    Min Huang, Xinli Zhang, Ruxue Ren, Huchang Liao , Edmundas Kazimieras Zavadskas , Jurgita Antuchevičienė
    Abstract 1884 | PDF Downloads 706 | DOI https://doi.org/10.3846/jcem.2020.12647
    Page 447-458
  • An integrated scientometric and SNA approach to explore the classics in CEM research

    Hengqin Wu, Zebin Zhao, Xiaolong Xue, Geoffrey Qiping Shen, Rebecca Jing Yang, Luqi Wang
    Abstract 2072 | PDF Downloads 827 | DOI https://doi.org/10.3846/jcem.2020.12645
    Page 459-474
  • Competitive advantages and barriers in international construction: an origin-host market approach

    Alicia Lozano-Torró , Tatiana García-Segura , Laura Montalbán-Domingo, Eugenio Pellicer
    Abstract 2382 | PDF Downloads 1493 | DOI https://doi.org/10.3846/jcem.2020.12180
    Page 475-489