Bian, Zhan, et al. “Scheduling for Yard Cranes Based on Two-Stage Hybrid Dynamic Programming”. Transport, vol. 33, no. 2, Jan. 2018, pp. 408–417, https://doi.org/10.3846/16484142.2016.1255993.