[1]
Z. Bian, Q. Xu, N. Li, and Z. Jin, “Scheduling for yard cranes based on two-stage hybrid dynamic programming”, Transport, vol. 33, no. 2, pp. 408–417, Jan. 2018, doi: 10.3846/16484142.2016.1255993.