(1)
Bian, Z.; Xu, Q.; Li, N.; Jin, Z. Scheduling for Yard Cranes Based on Two-Stage Hybrid Dynamic Programming. Transport 2018, 33 (2), 408–417. https://doi.org/10.3846/16484142.2016.1255993.