(1)
Ahmed, A.; Saeed, T. U.; Labi, S. Estimation of Rest Periods for Newly Constructed Reconstructed Pavements. Transport 2016, 31 (2), 183–191. https://doi.org/10.3846/16484142.2016.1193050.