[1]
Lee, E.-B. et al. 2020. Integrating CA4PRS V.3 road widening schedule module into US highway early constructability process: California SR-91 corridor improvement program case study. Transport. 35, 1 (Jan. 2020), 1–19. DOI:https://doi.org/10.3846/transport.2019.11650.