The criteria describing the need for highway reconstruction based on the theory of traffic flows and repay time

    Andrey Beljatynskij Info
    Nina Kuzhel Info
    Olegas Prentkovskis Info
    Olena Bakulich Info
    Irina Klimenko Info
DOI: https://doi.org/10.3846/1648-4142.2009.24.308-317

Abstract

General data on the network of Ukrainian highways are presented. The analysis of design methods of highway reconstruction based on the theory of traffic flows and economic calculations of its repay time is made. The relationship between traffic intensity and speed is shown by considering the theory of traffic flows. The methods, taking into account the principle of effectiveness of highway reconstruction based on its repay time, are discussed.

First published online: 27 Oct 2010

Keywords:

highway, reconstruction, repay time, cost, transport, vehicle, traffic intensity, traffic flow, speed, capital investments, transport expenses

How to Cite

Beljatynskij, A., Kuzhel, N., Prentkovskis, O., Bakulich, O., & Klimenko, I. (2009). The criteria describing the need for highway reconstruction based on the theory of traffic flows and repay time. Transport, 24(4), 308-317. https://doi.org/10.3846/1648-4142.2009.24.308-317

Share

Published in Issue
December 31, 2009
Abstract Views
664

View article in other formats

CrossMark check

CrossMark logo

Published

2009-12-31

Issue

Section

Original Article

How to Cite

Beljatynskij, A., Kuzhel, N., Prentkovskis, O., Bakulich, O., & Klimenko, I. (2009). The criteria describing the need for highway reconstruction based on the theory of traffic flows and repay time. Transport, 24(4), 308-317. https://doi.org/10.3846/1648-4142.2009.24.308-317

Share