Błaszczyk, T., & Nowak, M. (2009). The time‐cost trade‐off analysis in construction project using computer simulation and interactive procedure. Technological and Economic Development of Economy, 15(4), 523-539. https://doi.org/10.3846/1392-8619.2009.15.523-539