(1)
Golenko‐Ginzburg, D.; Baron, A.; Ben‐Yair, A.; Greenberg, D. Upon Scheduling Projects in a Design Office. TEDE 2005, 11 (4), 278-282. https://doi.org/10.3846/13928619.2005.9637708.