(1)
Sakalauskas, L.; Felinskas, G. Optimization of resource‐constrained Project Schedules by Simulated Annealing and Variable Neighborhood Search. TEDE 2006, 12 (4), 307-313. https://doi.org/10.3846/13928619.2006.9637759.