(1)
Błaszczyk, T.; Nowak, M. The time‐cost trade‐off Analysis in Construction Project Using Computer Simulation and Interactive Procedure. TEDE 2009, 15 (4), 523-539. https://doi.org/10.3846/1392-8619.2009.15.523-539.