[1]
Zolfaghari, S. et al. 2021. A type-2 fuzzy optimization model for project portfolio selection and scheduling incorporating project interdependency and splitting. Technological and Economic Development of Economy. 27, 2 (Apr. 2021), 493–510. DOI:https://doi.org/10.3846/tede.2021.14652.