“An Integrated Multi-Objective Optimization Model for Solving the Construction Time-Cost Trade-off Problem”. Journal of Civil Engineering and Management, vol. 21, no. 3, Feb. 2015, pp. 323-3, https://doi.org/10.3846/13923730.2013.802733.