[1]
A. Enshassi, S. Mohamed, and S. Abushaban, “Factors affecting the performance of construction projects in the Gaza strip”, JCEM, vol. 15, no. 3, pp. 269–280, Sep. 2009, doi: 10.3846/1392-3730.2009.15.269-280.