[1]
W.-C. Wang, T. Bilozerov, R.-J. Dzeng, F.-Y. Hsiao, and K.-C. Wang, “Conceptual cost estimations using neuro-fuzzy and multi-factor evaluation methods for building projects”, JCEM, vol. 23, no. 1, pp. 1–14, Jan. 2017, doi: 10.3846/13923730.2014.948908.