[1]
H. Abdul-Rahman, C. Wang, and N. B. Muhammad, “Project performance monitoring methods used in malaysia and perspectives of introducing EVA as a standard approach”, JCEM, vol. 17, no. 3, pp. 445–455, Sep. 2011, doi: 10.3846/13923730.2011.598331.