[1]
P. E. D. Love, D. J. Edwards, Z. Irani, and N. Forcada, “The latent causes of rework in floating production storage and offloading projects”, JCEM, vol. 20, no. 3, pp. 315–329, Jun. 2014, doi: 10.3846/13923730.2013.802725.