[1]
D. Cho, H. Cho, and D. Kim, “Automatic data processing system for integrated cost and schedule control of excavation works in NATM tunnels”, JCEM, vol. 20, no. 1, pp. 132–141, Mar. 2014, doi: 10.3846/13923730.2013.801907.