[1]
M. Gunduz and H. B. Sahin, “An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis”, JCEM, vol. 21, no. 4, pp. 470–477, Mar. 2015, doi: 10.3846/13923730.2014.890657.