[1]
A. N. Meshref, E. A. F. A. Elkasaby, A. A. K. M. Farid, H. Elmousalami, and A. Alotaibi, “Advancing the circular economy: a BIM and lean construction dynamic framework for pre-construction phases”, JCEM, vol. 32, no. 4, pp. 583–604, May 2026, doi: 10.3846/jcem.2026.26828.