[1]
C. Ho, Z. B. Zabinsky, and Y.-W. Kim, “Scheduling the production of prefabrication construction supply chains considering variable delivery times”, JCEM, vol. 32, no. 3, pp. 415–432, Apr. 2026, doi: 10.3846/jcem.2026.26156.