[1]
H.-H. Lee, K.-H. Kim, S. Son, K. Park, and S. Kim, “Time reduction effects of steel connected precast concrete components for heavily loaded long-span buildings”, JCEM, vol. 26, no. 2, pp. 160–174, Feb. 2020, doi: 10.3846/jcem.2020.11673.