Bożejko, W., Hejducki, Z., Uchroński, M. and Wodecki, M. (2014) “Solving resource-constrained construction scheduling problems with overlaps by metaheuristic”, Journal of Civil Engineering and Management, 20(5), pp. 649-659. doi: 10.3846/13923730.2014.906496.