Senouci, A. B. and Mubarak, S. A. (2016) “Multiobjective optimization model for scheduling of construction projects under extreme weather”, Journal of Civil Engineering and Management, 22(3), pp. 373-381. doi: 10.3846/13923730.2014.897968.