Ho, C., Zabinsky, Z.B. and Kim, Y.-W. (2026) “Scheduling the production of prefabrication construction supply chains considering variable delivery times”, Journal of Civil Engineering and Management, 32(3), pp. 415–432. doi:10.3846/jcem.2026.26156.